Azarga Metals Drills 10m at 134.2g/t silver and 1.63% copper at Unkur and further expands drilling program
HIGHLIGHTS
Assays for four new holes received. All intersected significant mineralization. Highlights include:
10 meters at 134.2g/t silver and 1.63% copper, with a six meter sub-section at 194.5g/t silver and 2.42% copper in drill-hole AM-017; and
11 meters at 58.0g/t silver and 0.87% copper in drill-hole AM-004
Lower mineralized zone observed previously in drill-hole AM-001 now confirmed as stratigraphically distinct from the upper zone, resulting in confirmation of a second distinct mineralized zone ("Unkur Lower" zone)
Expansion of first phase drilling program by an additional approximately 1,200 meters to approximately 6,200 meters
- Published: 31 October 2016
- Written by Editor