- Published: 31 October 2016
- Written by Editor
Azarga Metals Drills 10m at 134.2g/t silver and 1.63% copper at Unkur and further expands drilling program
SUMMARY OF EXPLORATION PROGRAM AND DRILLING TO DATE
Azarga Metals has now completed 11 diamond core drill-holes (approximately 2,900 cumulative linear meters of a planned approximately 6,200 meters) and is in the process of excavating three trenches at its Unkur Silver-Copper Project as per the map and tables below.
Table 1: Location details for Unkur phase one drilling program completed holes to date |
||||||||||||||||
Hole ID |
East |
North |
RL |
Dip |
Azimuth |
Hole type |
EOH |
Recovery |
||||||||
AM-001 |
56.84 |
118.57 |
929m |
70° |
253° |
DD |
401m |
95% |
||||||||
AM-003 |
56.84 |
118.57 |
931m |
70° |
254° |
DD |
96m |
95% |
||||||||
AM-004 |
56.84 |
118.57 |
931m |
70° |
244° |
DD |
383m |
95% |
||||||||
AM-005 |
56.84 |
118.57 |
930m |
70° |
242° |
DD |
160m |
95% |
||||||||
AM-007 |
56.83 |
118.58 |
928m |
70° |
239° |
DD |
80m |
95% |
||||||||
AM-008 |
56.83 |
118.58 |
1,013m |
70° |
239° |
DD |
601m |
95% |
||||||||
AM-009 |
56.82 |
118.58 |
976m |
70° |
236° |
DD |
225m |
95% |
||||||||
AM-011 |
56.82 |
118.59 |
960m |
70° |
234° |
DD |
179m |
95% |
||||||||
AM-013 |
56.82 |
118.59 |
1,000m |
70° |
231° |
DD |
100m |
95% |
||||||||
AM-015 |
56.82 |
118.60 |
1,044m |
70° |
230° |
DD |
196m |
95% |
||||||||
AM-017 |
56.83 |
118.78 |
913m |
70° |
242° |
DD |
278m |
95% |
Analyses are pending for drill-hole AM-008. Drill-holes AM-002 and AM-018 are currently being drilled.
Table 2: Unkur phase one drilling program assays reported to date (incl. this report) |
|||||
Hole ID |
Intersection |
From |
To |
Silver grade |
Copper grade |
AM-001 (IS 1) |
40m |
82.5m |
122.5m |
65.9g/t |
0.74% |
- AM-001 sub-section |
22m |
82.5m |
103.5m |
111.9g/t |
1.13% |
- AM-001 sub-section |
7m |
85.5m |
92.5m |
244.1g/t |
1.95% |
AM-001 (IS 2) |
18m |
314.5m |
322.5m |
70.0g/t |
0.81% |
- AM-001 sub-section |
7m |
320.5m |
327.5m |
137.7g/t |
1.51% |
AM-001 (IS 3) |
5m |
339.5m |
344.5m |
49.2g/t |
0.32% |
AM-003 |
16m |
56.5m |
72.5m |
84.0g/t |
0.79% |
- AM-003 sub-section |
5m |
59.5m |
64.5m |
200.4g/t |
1.39% |
AM-004 |
11m |
323.5m |
334.5m |
58.0g/t |
0.87% |
AM-007 |
10m |
49.0m |
59.0m |
20.2g/t |
0.29% |
AM-011 |
13.7m |
140.2m |
153.9m |
38.6g/t |
0.5% |
- AM-011 sub-section |
5.9m |
148.0m |
153.9m |
100.7g/t |
1.35% |
AM-013 |
6m |
71.0m |
77.0m |
27.7g/t |
0.66% |
AM-015 |
10m |
135.0m |
145.0m |
4.6g/t |
0.29% |
AM-017 |
10m |
192.5m |
202.5m |
134.2g/t |
1.63% |
- AM-017 sub-section |
6m |
192.5m |
198.5m |
194.5g/t |
2.42% |
Notes: n = full reported intersection and n = sub-section of the relevant full reported intersection. |
Drill-holes AM-005 and AM-009 did not intersect mineralization of significance.
Note: Drill intercepts are reported as drilled and may not be representative of true widths. Drill holes have been sited to attempt to intersect mineralization as close to perpendicular as possible, but there is not sufficient information about geometry of the mineralization at this time to estimate true widths. A Quality Assurance / Quality Control program is part of the sampling program at Unkur. This program includes chain of custody protocols as well as systematic submittals of standards, duplicates and blank samples into the flow of samples produced by the sampling including check assays of approximately 10% of the samples by another certified laboratory. Samples were analyzed at SGS Vostok Limited in Chita, Russia. Check assays will be analyzed at ALS Geochemistry in Chita, Russia.
UNKUR SILVER-COPPER PROJECT
Azarga Metals owns 60% of the Unkur Silver-Copper Project along with the right to acquire the remaining 40% in the future.
Sediment-hosted copper and silver mineralization has been identified across the 5,390 hectare project license area, in outcrops, trenches and by historical diamond drilling. The prior exploration outlined a large area of high-grade shallow stratiform sediment hosted copper-silver 20 to 50 meters thick over an area four to six kilometers long.
Further details concerning Unkur Silver-Copper Project are contained in a technical report filed by the Company as per its news release of 5 April 2016.
Qualified Person
The Company's President and Chief Executive Officer, Dorian L. (Dusty) Nicol, B.Sc. Geo, MA Geo, a Qualified Person as defined by NI 43-101, has reviewed and approved the exploration information disclosures contained in this Press Release.
About Azarga Metals Corp.
Azarga Metals is a mineral exploration and development company that owns 60% of the Unkur Silver-Copper Project in the Zabaikalsky province in eastern Russia.
AZARGA METALS CORP.
"Dusty Nicol"
Dorian L. (Dusty) Nicol, President and CEO
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statement:
This news release contains forward-looking statements that are based on the Corporation's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current planned exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Corporation disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
SOURCE Azarga Metals Corp.
Image with caption: "Map 1: Unkur Silver-Copper Project first phase exploration drill-hole and trench locations - Note: As yet undrilled hole locations are estimates only. (CNW Group/Azarga Metals Corp.)". Image available