Chakana Reports Significant Intercepts at Soledad, Peru Including 46m of 5.64% Copper, 592.9 g/t Silver, and 0.36 g/t Gold Provides Update on Resource Drilling
Soledad Project Highlights Include:
Resource definition holes at Breccia Pipe 1 ("Bx 1") completed; 62 drill holes totalling 17,936m
A total of 259 diamond core holes completed on the Soledad project to date for 60,225m
Additional resource definition drill results pending for Bx 5 and Huancarama
Gradient array and 3D induced polarization (IP) orientation surveys in progress
Vancouver, British Columbia--(September 7, 2021) - Chakana Copper Corp. (TSXV: PERU) (OTCQB: CHKKF) (FSE: 1ZX) (the "Company" or "Chakana"), is pleased to provide results from the final seven resource definition holes drilled in Bx 1 totaling 2,474.65m from the Soledad project, Ancash, Peru (Table 1). Drilling continues as part of a fully funded 26,000m exploration and resource drilling program planned for 2021 (Fig. 1). These results will increase confidence in the initial resource estimate, anticipated at the end of 2021.
- Published: 07 September 2021
- Written by Editor