Osisko Intersects 7.14 g/t Au Over 12.7 Metres at Garrison

TORONTO, ONTARIO--(Oct. 5, 2017) - Osisko Mining Inc. (TSX:OSK) ("Osisko" or the "Corporation") is pleased to announce new results from the ongoing drill program at its 100% owned Garrison gold project located in Garrison Township, Ontario. Over 70,000 metres of new drilling have been conducted by Osisko on the Garrison Project to date. A total of seventeen new intercepts in sixteen holes are reported in this release, with significant assay results presented in the table below.
 
Significant new results include:  7.14 g/t Au over 12.7 metres in OSK-G17-420; 5.18g/t Au over 17.0 metres and 1.62 g/t Au over 16.1 metres in OSK-G17-412; 1.37g/t Au over 30.2 metres in OSK-G17-408; 2.84 g/t over 7.1 metres in OSK-G17-415.
Read more: Osisko Mining Inc ( OSK )

Osisko Intersects 27 g/t Au Over 2.7 Metres at Lynx

High Grade Lynx Deposit Expanded Additional 210 Meters to NE
 
TORONTO, ONTARIO--(Oct. 3, 2017) - Osisko Mining Inc. (TSX:OSK) ("Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in Urban Township, Abitibi, Québec. The 800,000 metre drill program combines definition, expansion and exploration drilling in and around the main Windfall gold deposit and the adjacent Lynx deposit (located immediately NE of Windfall). Significant new analytical results from 23 intercepts in 17 drill holes focused on infill and expansion drilling in the Lynx deposit are presented below.
 
Highlights from the new results include: 27.0 g/t Au over 2.7 metres in OSK-W-17-906; 11.6 g/t Au over 4.4 metres in OSK-W-17-1039; 13.0 g/t Au over 3.6 metres in OSK-W-17-1102; 23.4 g/t Au over 2.0 metres in OSK-W-17-918; and 22.0 g/t Au over 2.0 metres in OSK-W-17-958. Maps showing hole locations and full analytical results are available at www.osiskomining.com.
Read more: Osisko Mining Inc ( OSK )

Torq Resources identifies a 25 km long gold corridor in Newfoundland

VANCOUVER, BRITISH COLUMBIA--(Sept. 21, 2017) -Torq Resources Inc. (TSX VENTURE:TORQ)(OTCQX:TRBMF) ("Torq" or the "Company") is pleased to announce the results from the regional till sampling program on its Gander Gold Project located in central Newfoundland, Canada. The program was designed to identify centers of gold mineralization beneath till cover and has successfully identified 6 gold-in-till anomalies over a 25 km long structural trend. These anomalies represent primary targets for future exploration and drilling. 
 
Torq's strategy is to rapidly advance these targets to drill-ready status through an in-fill till sampling program planned for the fall, followed by trenching and ground geophysics.
Read more: Torq Resources Inc ( TORQ )

 First Mining Finance Announces Positive Preliminary Economic Assessment for its Springpole Gold Project

VANCOUVER, British Columbia, Sept. 21, 2017  -- First Mining Finance Corp. (TSX:FF) (OTCQX:FFMGF) (FRANKFURT:FMG)(“First Mining” or the “Company”) is pleased to announce the positive results of an independent Preliminary Economic Assessment (“PEA”) for its Springpole Gold Project (the “Project”) in northwestern Ontario, Canada.  The PEA was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) by SRK Consulting (Canada) Inc. of Vancouver, Canada.  The PEA describes the potential technical and economic viability of establishing a conventional open-pit gold mine-and-mill complex for the Project.  The base case scenario utilizes long-term metal prices of $1,300 per ounce (“oz”) of gold (“Au”) and $20 per oz of silver (“Ag”).
Read more: First Mining Finance Corp ( FF )

Asanko Gold Operational Update

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 21, 2017) -
 
Highlights:
Reconciliation of grade control model to resource model reflecting total gold ounces up by 7% for three months ending August 2017 
Reserve reconciliation showing significant improvement comparing the mill feed to the reserve model over last three months
Mill feed grades in August were 2% above reserve grades
Mill feed to reserve model reconciliation of 100% in August
Blast movement technology contributing significantly to mining reconciliation improvements
436,000 tonnes of ore at 1.95 g/t gold mined in August
Read more: Asanko Gold Inc ( AKG )