Bonterra Resources drills 2.7 m of 34.5 g/t Au at Barry
Val-d'or, Quebec--(October 21, 2020) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce the following results from the ongoing drilling campaign at the Barry project. The results include several intersections, including 34.5 g/t Au over 2.7 metres ("m") in hole MB-20-286, 5.4 g/t Au over 2.55 m in hole MB-20-285, 4.5 g/t Au over 1.7 m in hole MB-20-284, and 6.9 g/t Au over 0.8 m in hole MB-20-281.
The 2020 drilling campaign at Barry resumed on July 23, 2020 with two drills in operation, one on a barge on Lake Limpide and the other on dry land near the deposit. Since July 23, 2020, the Company has drilled 37 holes representing a total of 13,002 m of a planned 20,000 m. Results from 19 holes have been received. Results from the remaining 18 drilled holes are pending.
This press release presents results from 12 holes received since the press release dated September 22, 2020, which presented results from the first seven holes.
Pascal Hamelin, Interim CEO and VP, Operations commented: "These results are very promising as all drill holes were testing the western extension of the existing resource. The western extension at Barry has been identified by Bonterra as a prospective area to confirm existing inferred resources and add new resources, and the results to date are confirming this view."
- Published: 21 October 2020
- Written by Editor