Bonterra Intersects 14.3 g/t Au over 2.1 Metres at Gladiator
Val-d'Or, Quebec--(Newsfile Corp. - November 30, 2020) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce very encouraging results from the ongoing drilling campaign at the Gladiator project. The results include several intersections, including 14.3 g/t Au over 2.1 metres ("m") and 3.4 g/t Au over 1.5 m in hole BA-20-24, 10.9 g/t Au over 0.5 m and 64.5 g/t Au over 0.6 m in hole BA-20-22 and 10.8 g/t Au over 0.5 m and 5.6 g/t Au over 1.5 m in hole BA-20-25.
Since July 23, 2020, the Company has drilled 24 holes representing a total of 8,042 m at the Gladiator project. Results from 7 holes have been received since the press release dated November 5, 2020. Results from the remaining drilled holes are pending (Table and Figure 1).
The Gladiator deposit consists of three primary zones; the North, Main and Barbeau Zones. The North and the Main Zone are characterized by felsic dyke hosted mineralized quartz veins within steeply south-southeast dipping shear zones having developed at the contacts between mafic and intermediate volcanics and gabbroic intrusions. The North Corridor and Footwall Zones are a series of mineralized zones also spatially associated with felsic dykes dipping north-northeast.
- Published: 30 November 2020
- Written by Editor