Revival Gold Intersects 2.29 g/t Gold Over 45.7 Meters Including 4.58 g/t Gold Over 10.1 Meters at Beartrack-Arnett
TORONTO, Feb. 22, 2021 -- RevivalGoldInc.(TSXV:RVG,OTCQB:RVLGF) (“Revival Gold” or the “Company”), a growth‐focused gold exploration and development company, is pleased to announce results from the final ten holes of the Company’s 2020 drilling program at the Beartrack-Arnett Gold Project (“Beartrack-Arnett”) located in Idaho, USA.
Highlights from today’s drill results include two core holes drilled in the Joss target area at the southern end of Beartrack. The holes were drilled to test for high-grade sulphide mineralization and to validate a conceptual underground mining target hosted within the main shear zone as well as in cross structures. Summary results below:
2.29 g/t gold over 45.7 meters1 including 4.58 g/t gold over 10.1 meters in BT20-235D
2.41 g/t gold over 43.9 meters1 including 6.84 g/t gold over 3.9 meters in BT20-227D
1 Drilled width; true width is unknown at this time.
An additional five core holes were drilled between the North and South Pits in the central Beartrack area and successfully confirmed the continuity of mineralized structure over 400-600 meters of strike in this previously untested area. Mineralization in this location remains open at depth.
- Published: 24 February 2021
- Written by Editor