Endeavour Mining Delivers 310,000 Oz Gold Production Exceeding 2012 Guidance and Provides 2013 Forecast

Endeavour Mining Corporation ("Endeavour" or the "Corporation") (TSX:EDV, ASX:EVR, OTCQX:EDVMF) announces total annual production for 2012 of 310,778 ounces of gold exceeding the 2012 production guidance range of 282,000 to 304,000 ounces.  For 2013, Endeavour expects gold production in the range of 310,000 to 345,000 ounces at a cash cost per ounce (excluding royalties) of $790 to $830, with all gold sold at spot prices due to recent de-hedging transactions.  Additional near-term production growth of over 100,000 ozs per year is expected from the Agbaou Gold Mine which is currently in construction (Q1 2014 completion). A recently completed Preliminary Economic Assessment (PEA) shows potential for 160,000 ozs per year from the Houndé Gold Project (Burkina Faso) in 2016.

(All amounts in US dollars unless otherwise indicated)

Read more: Endeavour Mining Corporation ( EDV )

Klondex Discovers a New “West Zone” with Significant Visible Gold Mineralization and 123.9 Grams/Tonne (3.6 oz/ton) Gold Over 1.5 Meters (5 feet)

Klondex Mines Ltd. (TSX: KDX or OTCQX: KLNDF), a Northern Nevada gold exploration and development company, announces the discovery of new gold mineralization at its flagship Fire Creek project. The discovery (Figure 1 click here) is approximately 165 meters (540 feet) west of the A-Vein mineralization, which forms part of the Main Zone, and represents a new unexplored zone. Klondex intersected 123.9 grams/tonne gold (3.6 oz/ton) over 1.5 Meters (5 feet) while completing a geotechnical drill hole for the design of the planned vent raise. Klondex also encountered visible gold mineralization in three locations in the area: on the left rib of the nearby drift (Figure 2), in a drill hole at the base of the access ramp 5370-RM (Figure 3), and in the geotechnical hole, approximately 6 meters (20 feet) above the access ramp (Figure 4) Click here for Figures 2, 3 & 4.

Read more: Klondex Mines Ltd ( KDX )

Metanor Intersects 29.63 g/t Over 4.42m, 14.79 g/t Over 14.02m and 19.19 g/t Over 8.48m at Its Bachelor Project

  Metanor Resources Inc. ("Metanor") (TSX VENTURE:MTO) is pleased to release an update regarding the current drilling program at its Bachelor project.

Following the bulk sampling program of 5,000 tonnes in July (Refer to press release dated July 12th 2012), the company did significant progress in developing its underground infrastructure required to eventually begin its commercial production. In November 2012, the company began its long hole stoping activities in certain stopes, allowing the increase in monthly production (Refer to press release dated December 11th, 2012).

Read more: Metanor Resources Inc ( MTO )

Gold Fields Releases Drilling Results from the Woodjam North Copper-Gold Property Drill Hole DH12-48 returns 255.0 m grading 1.91 g/t Gold Equivalent

Consolidated Woodjam Copper Corp. ("Woodjam Copper") (TSX-V: WCC) is pleased to report that Gold Fields Horsefly Exploration Corporation ("Gold Fields") a subsidiary of Gold Fields Limited (JSE, NYSE, NASDAQ, Dubai: GFI), has released assay data for the final 52 drill holes (totaling 16,214.82 m) of the 2012 drilling program on the Woodjam North Property (location maps for the drilling can be viewed at (www.woodjamcopper.com). A complete table of results is attached to this news release. The property is located approximately 45 km east of the City of Williams Lake, BC.

Read more: Consolidated Woodjam Copper Corp ( WCC )

Eurasian Minerals Drills the Highest Grade Intercept to Date of 2.15 Meters Averaging 89.34 g/t Gold and 835.16 g/t Silver at the Akarca Project, Northwest Turkey

Eurasian Minerals Inc. (the "Company" or "EMX") (TSX VENTURE:EMX)(NYSE MKT:EMXX) is pleased to announce results from the first two holes of the 2012-2013 drill campaign at the Akarca gold-silver project in northwest Turkey. The results include an oxide intercept starting at surface of 36.4 meters averaging 5.67 g/t gold and 53.31 g/t silver, with a sub-interval of 2.15 meters averaging 89.34 g/t gold and 835.16 g/t silver that represents the highest grade intercept drilled to date on the property (true widths interpreted as 60-75% of reported interval length). The bonanza intercept highlights the project's high-grade gold-silver exploration potential. In addition, the Company's recent programs of geologic mapping and surface sampling have identified several new zones of gold-silver mineralization for follow-up drilling.

Read more: Eurasian Minerals Inc ( EMX )