- Published: 10 February 2017
- Written by Editor
Atlantic Gold Reports First Stage Results from the Resource Definition Drill Program at Fifteen Mile Stream
Results of the drilling program to date are tabulated below:
Hole id | Easting | Northing | Dip | Az. |
Depth (m) |
Significant Intervals (≥ 0.5g/t Au and up to 3m internal dilution) |
||||
From (m) |
To (m) |
Width (m) |
Approx. true width (m) |
Grade (g/t Au) |
||||||
FMS-16-001 | 12900 | 10080 | -60 | 175 | 101 | NSA | ||||
FMS-16-002 | 12900 | 10060 | -60 | 175 | 80 | 56 | 63 | 7 | 6 | 1.39 |
FMS-16-003 | 12900 | 10040 | -60 | 175 | 60 | NSA | ||||
FMS-16-004 | 12900 | 10020 | -60 | 175 | 41 | NSA | ||||
FMS-16-005 | 13600 | 10200 | -60 | 175 | 101 | 75 | 81 | 6 | 6 | 0.97 |
FMS-16-006 | 13475 | 10100 | -60 | 175 | 140 | 25 | 26 | 1 | 0.7 | 3.71 |
and | 30 | 31 | 1 | 0.7 | 47.4 | |||||
and | 111 | 123 | 12 | 8.5 | 1.17 | |||||
FMS-16-007 | 13600 | 10180 | -60 | 175 | 101.5 | 83 | 94 | 11 | 11 | 1.05 |
FMS-16-008 | 13600 | 10160 | -60 | 175 | 92 | 56 | 82 | 26 | 26 | 1.03 |
FMS-16-009 | 13600 | 10140 | -60 | 175 | 80 | 43 | 67 | 24 | 24 | 1.20 |
FMS-16-010 | 13475 | 10040 | -60 | 175 | 63 | 9.5 | 26 | 16.5 | 11.5 | 1.29 |
and | 36 | 41 | 5 | 3.5 | 1.49 | |||||
and | 63 | 64 | 1 | 0.7 | 19.1 | |||||
FMS-16-011 | 13475 | 10060 | -60 | 175 | 83 | 7 | 19 | 12 | 8.5 | 0.66 |
and | 42 | 68 | 26 | 18 | 0.73 | |||||
and | 74 | 83 | 9 | 6.5 | 0.93! | |||||
FMS-17-012 | 12500 | 10080 | -60 | 175 | 101 | 66 | 75 | 9 | 8.5 | 0.76 |
FMS-17-013 | 13475 | 10080 | -60 | 175 | 122 | 10 | 18 | 8 | 5.5 | 3.72 |
(incl. | 14 | 15 | 1 | 0.7 | 26.5) | |||||
and | 43 | 50 | 7 | 5 | 0.93 | |||||
and | 71 | 94 | 23 | 16 | 2.44 | |||||
(incl. | 71 | 72 | 1 | 0.7 | 23.3) | |||||
and | 100 | 105 | 5 | 3.5 | 0.66 | |||||
FMS-17-014 | 12500 | 10040 | -60 | 175 | 62 | 4 | 9 | 5 | 5 | 2.20 |
and | 19 | 20 | 1 | 1 | 3.79 | |||||
and | 42 | 47 | 5 | 5 | 3.38 | |||||
FMS-17-015 | 13650 | 10200 | -60 | 175 | 113 | 98 | 107 | 9 | 7 | 1.21 |
FMS-17-016 | 12500 | 10020 | -60 | 175 | 41 | NSA | ||||
FMS-17-017 | 12500 | 10060 | -60 | 175 | 80 | 60 | 66 | 6 | 6 | 1.13 |
FMS-17-018 | 13650 | 10180 | -60 | 175 | 101 | 73 | 81 | 8 | 8 | 0.81 |
FMS-17-019 | 12450 | 10080 | -60 | 175 | 110 | 10 | 14 | 4 | 4 | 1.03 |
and | 20 | 21 | 1 | 1 | 3.55 | |||||
and | 82 | 83 | 1 | 1 | 19.1 | |||||
and | 87 | 90 | 3 | 3 | 1.67 | |||||
FMS-17-020 | 13650 | 10160 | -60 | 175 | 92 | 64 | 72 | 8 | 8 | 2.19 |
NSA: No significant assays. |
! Mineralization to end of hole |
The current resource estimate for Fifteen Mile Stream is as follows:
Category | Tonnes (millions) | Grade (g/t) Au | Contained Au (oz.) |
FIFTEEN MILE STREAM | |||
Inferred Resource | 11.72 | 1.55 | 584,000 |
Resources that are not reserves do not have demonstrated economic viability |
The Mineral Resource estimate for Fifteen Mile Stream is quoted at a cut-off grade of 0.5g/t. It has an effective date of February 16, 2015 and was prepared as part of a technical report in accordance with NI 43-101 by Mr. Neil Schofield, a principal of FSSI (Australia) Pty Ltd, released on April 2, 2015 on SEDAR.
Results and updates from this drilling program will be reported progressively.
Technical Disclosure
All assays are 50g charge fire assays conducted on whole-sample pulverized 1m samples of sawn, half NQ core with 1-in-10 duplicate assays and insertion of standards and blind blanks. Sample preparation and assaying is conducted at the Sudbury and Vancouver laboratories of ALS Canada Ltd, an entity having no other relationship with the Company. Core recovery is estimated for each metre and averages >97%. Standards, blanks and duplicate assay results are acceptable.
True width of the mineralization varies according to the dip of the enclosing stratigraphy. It is therefore noted for each intersection (see table above) .
The individual drill hole assay results underlying the mineralized intersections listed in the table above have been verified by detailed checking against the original assays sheets. The lengths and average grades of each intersection have also been checked against the drill hole assay logs.
Wally Bucknell, Director of Exploration to the Company and a Qualified Person as defined by National Instrument 43-101 ("NI 43-101") has reviewed and approved the contents of this news release.
Further updates will be provided in due course.
On behalf of the Board of Directors,
Steven Dean, Chairman and Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements:
This release contains certain "forward looking statements" and certain "forward-looking information" as defined under applicable Canadian and U.S. securities laws. Forward-looking statements and information can generally be identified by the use of forward-looking terminology such as "may", "will", "expect", "intend", "estimate", "anticipate", "believe", "continue", "plans" or similar terminology. Forward-looking statements and information are not historical facts, are made as of the date of this press release, and include, but are not limited to, statements regarding discussions of future plans, guidance, projections, objectives, estimates and forecasts and statements as to management's expectations with respect to, among other things, the activities contemplated in this news release and the timing and receipt of requisite regulatory, and shareholder approvals in respect thereof. Forward-looking statements in this news release include, without limitation, statements related to proposed exploration and development programs, grade and tonnage of material and resource estimates. These forward looking statements involve numerous risks and uncertainties and actual results may vary. Important factors that may cause actual results to vary include without limitation, the timing and receipt of certain approvals, changes in commodity and power prices, changes in interest and currency exchange rates, risks inherent in exploration estimates and results, timing and success, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), changes in development or mining plans due to changes in logistical, technical or other factors, unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications, cost escalation, unavailability of materials, equipment and third party contractors, delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, the assumptions that:
(1) market fundamentals will result in sustained gold demand and prices; (2) the receipt of any necessary approvals and consents in connection with the development of any properties; (3) the availability of financing on suitable terms for the development, construction and continued operation of any mineral properties; and (4) sustained commodity prices such that any properties put into operation remain economically viable. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. Certain of the risks and assumptions are described in more detail in the Company's audited financial statements and MD&A for the year ended December 31, 2015 and for the quarter ended September 30, 2016 on the SEDAR website at www.sedar.com. The actual results or performance by the Company could differ materially from those expressed in, or implied by, any forward-looking statements relating to those matters. Accordingly, no assurances can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what impact they will have on the results of operations or financial condition of the Company. Except as required by law, the Company is under no obligation, and expressly disclaim any obligation, to update, alter or otherwise revise any forward-looking statement, whether written or oral, that may be made from time to time, whether as a result of new information, future events or otherwise, except as may be required under applicable securities laws.
Atlantic Gold Corporation
Maryse Belanger
COO
+1 604 689-5564