Category: Silver / Gold

Balmoral drills 41.95 m of 3.24 g/t Au at Martiniere

Mr. Darin Wagner reports
 
BALMORAL INTERSECTS 41.95 METRES GRADING 3.24 G/T GOLD INCLUDING 11.58 METRES GRADING 6.30 G/T GOLD, BUG SOUTH GOLD DEPOSIT, MARTINIERE PROPERTY, QUEBEC
 
Balmoral Resources Ltd.'s Bug South gold deposit on the company's Martiniere property in Quebec continues to return broad intersection of high-grade gold mineralization and show good continuity between sections. Results were released from seven holes testing Bug South completed during the fall program and were highlighted by:
 
41.95 metres grading 3.24 grams per tonne gold, including 11.58 m grading 6.30 g/t gold from the Upper Bug zone -- hole MDE-16-246B;
13.93 m grading 4.07 g/t gold from the Upper Bug zone -- hole MDE-16-250;
10.13 m grading 7.34 g/t gold, including 5.34 m grading 13.54 g/t gold from the hangingwall zone -- hole MDE-16-247;
13.79 m grading 2.80 g/t gold, including 2.22 m grading 16.33 g/t gold from the 221 zone -- hole MDE-16-247.
The Upper Bug zone of the Bug South deposit continues to exhibit excellent continuity ranging in downhole thickness in the holes released today from 5.83 to 88.36 metres. The Upper Bug zone continues to exhibit a well-defined, south-southeast-plunging area of enhanced thickness and grade. Updated cross-sections for the Bug South deposit featuring the results of the holes released today are available at the company's website. Strong gold values also continue to be intersected throughout the deposit area in the hangingwall porphyry (HWP), hangingwall and recently discovered 221 zones.
 
Hole                   From          To   Interval*        Gold
No.                (metres)    (metres)    (metres)       (g/t)

MDE-16-244            98.08      102.64        4.56        0.34
                     206.04      226.83       20.79        2.16
including            206.04      211.51        5.47        5.63
which includes       210.32      211.51        1.19       16.65
                     297.92      303.75        5.83        1.27
including            299.17      300.50        1.33        3.53
                     346.47      354.18        7.71        0.68
MDE-16-245            52.64       62.33        9.69        0.18
                      88.05      176.41       88.36        1.07
including            127.83      128.38        0.55        6.70
and                  156.64      164.41        7.77        2.99
                     210.90      220.68        9.78        1.20
including            213.31      214.12        0.81        6.06
MDE-16-246B          256.05      334.35       78.30        1.94
includes             281.68      282.35        0.67        6.41
and                  292.40      334.35       41.95        3.24
which includes       313.07      324.65       11.58        6.30
which includes       316.50      317.08        0.58       19.40
and                  318.95      319.69        0.74       11.60
and                  323.57      324.65        1.08       33.91
and                  331.58      332.43        0.85       62.30
                     345.42      348.95        3.53        4.37
including            347.59      348.26        0.67       18.05
MDE-16-247           137.28      151.07       13.79        2.80
including            144.74      146.96        2.22       16.33
                     190.83      200.96       10.13        7.34
including            192.71      198.05        5.34       13.54
which includes       192.71      194.00        1.29       47.50
                     311.87      338.00       26.13        0.64
including            337.00      338.00        1.00        4.66
MDE-16-248           103.96      150.19       46.23        0.98
including            122.75      143.37       20.62        1.88
which includes       122.75      124.20        1.45        5.39
and                  129.48      130.80        1.32        7.77
                     161.31      172.79       11.48        0.37
                     198.50      206.02        7.52        0.48
MDE-16-249           230.60      244.98       14.38        0.72
MDE-16-250           114.21      132.96       18.75        0.95
including            122.28      123.76        1.48        9.73
                     172.27      201.20       28.93        2.15
including            174.14      188.07       13.93        4.07
which includes       177.44      184.69        7.25        5.40
which includes       183.95      184.69        0.74       14.40

Note
* Reported drill intercepts are not true widths. At this time 
there are insufficient data with respect to the shape of the 
mineralization to calculate true orientations in space although 
they are estimated to range between approximately 70 and 77
per cent of true thickness. All values presented are uncapped.

 

The company also intersected a new zone of zinc-lead-silver-gold veining at shallow depth in hole MDE-16-245. The 5.36-metre-wide interval between 54.79 and 60.15 metres downhole returned an average grade of 2.80 per cent zinc, 2.67 per cent lead, 99.11 grams per tonne silver and 0.19 g/t gold. This is the first time that mineralization of this nature (Zn-Pb-Ag-Au) has been intersected on the Martiniere property, although high-grade silver mineralization is known from the Martiniere East area. This new discovery appears to crosscut the local stratigraphy. Its origin and relationship to the Bug Lake gold deposits and/or the VMS (volcanogenic massive sulphide) system in the Martiniere East area are currently unknown.

Additional results from the fall drill program on the Martiniere property and on Balmoral's Detour East property remain pending. Work on the winter road into the Martiniere camp continues and, weather conditions permitting, drilling is expected to commence on the property in early February.

Balmoral will have drill core from the Bug South gold deposit on display in the core shack, booth 820, at the 2017 Mineral Exploration Round-Up in Vancouver, B.C., on Jan. 23 and Jan. 24, and at the Prospectors and Developers Association of Canada convention in Toronto, Ont., on March 5 and March 6.

Quality control

Darin Wagner, PGeo, president and chief executive officer of the company, is the non-independent qualified person for the technical disclosure contained in this news release. Mr. Wagner has supervised the Quebec-based work programs on the Martiniere property since inception, visited the property on multiple occasions, examined the drill core from the holes summarized in this release, discussed and reviewed the results with senior on-site geological staff, and reviewed the available analytical and quality control results.

Balmoral has implemented a quality control program for all of its drill programs, to ensure best practice in the sampling and analysis of the drill core, which includes the insertion of blind blanks, duplicates and certified standards into sample stream. NQ-sized drill core is saw cut with half of the drill core sampled at intervals based on geological criteria including lithology, visual mineralization and alteration. The remaining half of the core is stored on-site at the company's Martiniere field camp in central Quebec. Drill core samples are transported in sealed bags to ALS Minerals' Val d'Or, Que., analytical facilities. Gold analyses are obtained via industry-standard fire assay with atomic absorption finish using 30-gram aliquots. For samples returning greater than five g/t gold follow-up fire assay analysis with a gravimetric finish is completed. The company has also requested that any samples returning greater than 10.00 g/t gold undergo screen metallic fire assay. Following receipt of assays, visual analysis of mineralized intercepts is conducted and additional analysis may be requested. ALS Minerals is ISO 9001:2008 certified and the Val d'Or facilities are ISO 17025 certified for gold analysis.

About Balmoral Resources

Balmoral is a well-financed, Canadian-based company actively delineating and expanding a series of high-grade gold deposits on its Martiniere property located within the prolific Abitibi greenstone belts in Quebec, Canada. The Martiniere property is just one of several large, highly prospective properties comprising the company's wholly owned, 1,000-square-kilometre Detour Trend project.

Employing an aggressive, drill-focused exploration style in one of the world's pre-eminent mining jurisdictions, Balmoral is following an established formula with a goal of maximizing shareholder value through discovery and definition of high-grade, Canadian gold and base metal assets.

We seek Safe Harbor.