- Published: 03 October 2016
- Written by Editor
Auryn Resources Provides Update on 60% of the 2016 Committee Bay Results
--------------------------------------------------------------------------- From To Length Grade Target Area Hole ID (meters) (meters) (meters) Au g/t --------------------------------------------------------------------------- Anuri 16ARR003 36.58 50.29 13.71 1.91 --------------------------------------------------------------------------- 108.21 112.78 4.57 1.48 --------------------------------------------------------------------------- Anuri 16ARR002 153.92 173.74 19.81 0.81 --------------------------------------------------------------------------- Muskox 16MXR002 96.01 103.63 7.62 0.4 --------------------------------------------------------------------------- West Plains 16WPR047 79.25 83.82 4.6 1.86 ---------------------------------------------------------------------------
Diamond Drilling Results:
The diamond drilling at the Three Bluffs deposit had a primary objective of extending the mineralization at the deposit to depth (see figure 2). The program has successfully extended the depth of mineralization 200 to 250 meters vertically on the western half of the deposit to 450 meters vertical depth and between 100 to 250 meters on the eastern half of the deposit to 760 meters vertical depth. Drill highlights of the five hole program are listed in the table below:
---------------------------------------------------------------------------- Nearest drill hole From To Length Grade Target Area Hole ID (meters) (meters) (meters) (meters) Au g/t ---------------------------------------------------------------------------- Antler 16AN043 240 results pending ---------------------------------------------------------------------------- Antler 16AN044 190 443 452 9 3.43 ---------------------------------------------------------------------------- including 444 477 3 7.44 ---------------------------------------------------------------------------- Three Bluffs 16TB147 150 419 442 23 2.5 ---------------------------------------------------------------------------- including 430 433 3 7.01 ---------------------------------------------------------------------------- Three Bluffs 16TB148 110 465 476 11 1.73 ---------------------------------------------------------------------------- 552 566 14 1.73 ---------------------------------------------------------------------------- 600 601 1 10.95 ---------------------------------------------------------------------------- Three Bluffs 16TB149 250 777 807 30 2.12 ---------------------------------------------------------------------------- including 801 806 5 7.01 ----------------------------------------------------------------------------
The Company has ordered and shipped fuel for a 25,000 meter drill program in 2017 which will be focused on testing 6 significant new targets identified in the 2016 program as well as following up on current results.
Shawn Wallace, President and CEO, commented " We are very pleased with the amount of work we were able to complete at our Committee Bay project this year as well as the success we have had in encountering gold mineralization beneath the till cover. Our 2017 program will be refined by what we learned this year and spread across 6 different targets that are drill ready."
Mr. Wallace further stated, "With the recent acquisitions of Homestake and Banos Del Indio, we have assembled the bulk of our exploration portfolio and are now focused on the drilling and exploration of all three project areas in the coming year."
Figure 1: Illustrates belt wide exploration through till sampling and drone imagery acquisition. 2016 drill targets are highlighted by the red polygons: http://media3.marketwire.com/docs/Auryn103.jpg
Figure 2: Illustrates the large-scale step out drill program on the Three Bluff deposits. Results demonstrate the deposit is open to depth and along strike:http://media3.marketwire.com/docs/Auryn103b.jpg
ON BEHALF OF THE BOARD OF DIRECTORS OF AURYN RESOURCES INC.
Shawn Wallace
President & Director
Michael Henrichsen, P.Geo, COO of Auryn, is the Qualified Person who assumes responsibility for the technical disclosures in this press release.
RAB Drilling Results
Intercepts were calculated using a minimum of a 0.25 g/t Au cut off at beginning and end of the intercept and allowing for no more than four consecutive samples (six meters) of less than 0.25 g/t Au.
Analytical samples were taken using 1/8 of each 5ft (1.52m) interval material (chips) and sent to ALS Lab in Vancouver, BC for preparation and analysis. All samples are assayed using 50g nominal weight fire assay with atomic absorption finish (Au-AA26) and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61). QA/QC programs using internal standard samples, field and lab duplicates and blanks indicate good accuracy and precision in a large majority of standards assayed.
True widths of mineralization are unknown based on current geometric understanding of the mineralized intervals.
Diamond Drilling Results
Intercepts were calculated using a minimum of a 1.0 g/t Au cut off at beginning and end of the intercept and allowing for no more than six consecutive meters of less than 1.0 g/t Au.
Analytical samples were taken by sawing NQ diameter core into equal halves on site and sent one of the halves to ALS Lab in Vancouver, BC for preparation and analysis. All samples are assayed using 50g nominal weight fire assay with gravimetrical finish (Au-GRA22) and multi-element four acid digest ICP-AES/ICP-MS method (ME-MS61). QA/QC programs using internal standard samples, field and lab duplicates and blanks indicate good accuracy and precision in a large majority of standards assayed.
Based on the estimated geometry of the mineralized zones, the true widths of the intervals drilled at the Three Bluff deposit are believed to be at approximately 40-75% of the drilled widths.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts:
Auryn Resources Inc.
+1 (778) 729-0600
This email address is being protected from spambots. You need JavaScript enabled to view it.
www.aurynresources.com