- Published: 31 August 2016
- Written by Editor
Premier extends high grade mineralization at McCoy-Cove
All abbreviations used in this press release are available by following this link (click here).
Supplementary images complementing this press release can be viewed by following this link (click here).
Table 1: CSD Gap exploration drill program results |
|||||||||||
Hole ID |
Coordinates(1) (m) |
Dip/Azimuth |
From (m) |
To (m) |
Core (m) |
Au |
Ag |
Core (ft) |
Au |
Ag |
Comment |
PG16-07 |
4465563N/481906E |
-52/057 |
502.3 |
525.0 |
22.7 |
3.40 |
86.59 |
74.5 |
0.10 |
2.53 |
CSD Gap |
502.3 |
504.7 |
2.4 |
5.77 |
689.00 |
8.0 |
0.17 |
20.10 |
including |
|||
513.6 |
516.9 |
3.4 |
9.80 |
42.46 |
11.0 |
0.29 |
1.24 |
including |
|||
PG16-08 |
4465563N/481906E |
-52/060 |
602.0 |
605.4 |
3.4 |
4.41 |
0.73 |
11.3 |
0.13 |
0.02 |
CSD Gap |
635.8 |
656.2 |
20.4 |
7.79 |
3.58 |
67.0 |
0.23 |
0.10 |
CSD Gap |
|||
646.0 |
656.2 |
10.2 |
12.14 |
4.97 |
33.5 |
0.35 |
0.14 |
including |
|||
PG16-09 |
4465563N/481906E |
-51/068 |
637.3 |
675.9 |
38.6 |
7.75 |
3.92 |
126.5 |
0.23 |
0.11 |
CSD Gap |
644.0 |
646.5 |
2.4 |
18.32 |
6.01 |
8.0 |
0.53 |
0.18 |
including |
|||
661.6 |
673.5 |
11.9 |
16.01 |
7.92 |
39.2 |
0.47 |
0.23 |
including |
|||
PG16-10 |
4465389N/481988E |
-57/056 |
569.9 |
575.8 |
5.9 |
6.93 |
2.49 |
19.3 |
0.20 |
0.07 |
CSD Gap |
632.9 |
650.3 |
17.4 |
10.87 |
15.23 |
57.0 |
0.32 |
0.44 |
CSD Gap |
|||
PG16-11 |
4465432N/481977E |
-55/057 |
553.7 |
565.3 |
11.6 |
9.63 |
3.31 |
38.0 |
0.28 |
0.10 |
CSD Gap |
553.7 |
559.6 |
5.9 |
15.95 |
4.79 |
19.5 |
0.47 |
0.14 |
including |
|||
629.1 |
648.3 |
19.2 |
9.69 |
17.48 |
63.0 |
0.28 |
0.51 |
CSD Gap |
|||
643.1 |
648.3 |
5.2 |
19.37 |
55.37 |
17.0 |
0.56 |
1.61 |
including |
1) UTM NAD83, Zone 11 |
|||||
The McCoy-Cove Property is located along the prolific Battle Mountain-Eureka Trend that is host to numerous multi-million ounce producing and past-producing including the McCoy and Cove open pits and underground operations, which produced a combined 3.3 million ounces of gold and 110 million ounces of silver between 1986 and 2003. The property is located in close proximity to excellent infrastructure (including paved roads & power) and all permits are in place for an advanced surface drilling campaign.
Stephen McGibbon, P. Geo., is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. Drill samples were sent to ALS Laboratories in Reno, Nevada for analysis with the analytical facility utilizing 30 gram fire assay with an AA finish for RC samples and 30 gram fire assay with AA finish and ICP-MS 30 element scan from 4-acid digestion for core samples. Over-limit samples receive an automatic gravimetric finish.
Premier Gold Mines Limited is one of North America's leading junior producing companies with a high-quality pipeline of projects focused in proven, safe and accessible mining jurisdictions in Canada and the United States that includes world class gold mining districts such as Red Lake and Geraldton in Ontario and the Carlin and Eureka-Battle Mountain Trends in Nevada.
This Press Release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
SOURCE Premier Gold Mines Limited
Image with caption: "Figure 1: Schematic longitudinal section of the Cove Au/Ag deposits (CNW Group/Premier Gold Mines Limited)". Image available at:http://photos.newswire.ca/images/download/20160831_C8365_PHOTO_EN_763034.jpg
Image with caption: "Figure 2: Schematic X-Section of CSD Gap mineralization (CNW Group/Premier Gold Mines Limited)". Image available at:http://photos.newswire.ca/images/download/20160831_C8365_PHOTO_EN_763036.jpg
Contact: