- Published: 02 June 2016
- Written by Editor
Auryn Resources Options Huilacollo Gold Project and Expands Land Position in Southern Peru
Table 1: |
Huilacollo selected intercepts |
Hole_ID | From | To | Interval | Au g/t | Ag g/t | Au g/t*meters |
AM-14 | 0 | 82.5 | 82.5 | 1.16 | 6.5 | 95.6 |
AM-13 | 0 | 62 | 62 | 0.94 | 12.1 | 58.1 |
AM-13 | 128 | 146 | 18 | 1.04 | 4.3 | 18.7 |
AM-06 | 0 | 88 | 88 | 1.05 | 9.0 | 92.1 |
AM-16 | 0 | 82 | 82 | 0.99 | 18.5 | 80.9 |
AM-01 | 0 | 80 | 80 | 1.29 | 11.8 | 103.2 |
AM-02 | 0 | 50.65 | 50.65 | 1.24 | 9.3 | 63.0 |
HU-3 | 5.45 | 39.45 | 34 | 2.14 | 22.1 | 72.9 |
Intercepts were calculated using a minimum of a 0.2 g/t Au cut off at beginning and end of the intercept and allowing for no more than four meters of less than 0.2 g/t Au. True widths of the reported intercepts are believed to be approximately 60% of the drilled widths. |
Higher grade zones within the mineralized zone appear to be focused along well defined feeder structures as highlighted by trench intercepts up to 38m at 6.7g/t Au and drill holes including 34m @ 2.14g/t. Importantly, the mineralization as currently defined, represents less than 10% of the area of first order geophysical targets defined by overlapping high resistivity and low chargeability zones that represent the potential for oxide gold mineralization within silica bodies (see figure 5). Initial exploration work will focus on rapidly establishing drill targets through structural mapping, trenching, volumetric sampling, and multi-spectral analysis with an initial drill program planned for the fourth quarter of 2016.
Huilacollo has excellent infrastructure with access by road, nearby high voltage power lines and water.
The Company acquired the rights to the Huilacollo property through an option agreement with a local Peruvian company, Inversiones Sol S.A.C. (the "Huilacollo Option"). Under the Huilacollo option, the Company may acquire a 100% interest, subject to a NSR, through a combination of work expenditures and cash payments as detailed in the table below:
Due dates | Property Payments | Work Expenditures |
All amounts in US dollars | ||
Effective Date (May 31, 2016) | $ 250,000 | - |
Within 24 months of the Effective Date | $ 500,000 | $ 2,000,000 |
Within 36 months of the Effective Date | - | $ 3,000,000 |
Within 48 months of the Effective Date | $ 250,000 | - |
Within 60 months of the Effective Date | $ 250,000 | $ 2,000,000 |
Within 72 months of the Effective Date | $ 7,500,000 | - |
Total | $ 8,750,000 | $ 7,000,000 |
The Huilacollo NSR is 1.5% and buyable for $2,500,000 on precious metals and 2.5% buyable for $7,000,000 on base metals.
The Curibaya Property
The Curibaya property comprises of 31,600 hectares covering the regional Incapuquio fault zone and subsidiary structures that are collectively interpreted as one of the fundamental controls for both epithermal and porphyry styles of mineralization within the region. Importantly the licenses host a number of cross structures to the Incapuquio fault zone that are considered highly prospective (figure 2). Auryn has undertaken an initial exploration program that consisted of a cyanide leach stream sediment survey that has identified a cluster of gold & copper anomalies in contiguous drainage basins within the SW portion of the claim block spanning an area of approximately 50 square kilometers (see figures 6 and 7). These anomalies are the first stage of developing Cu/Au porphyry and Au epithermal targets.
The Company acquired 100% ownership in the Curibaya property through direct staking and the national auction process. The total cost to acquire the licenses was approximately $200,000.
Michael Henrichsen (Chief Operating Officer), P.Geo is the QP who assumes responsibility for the technical contents of this press release.
About Auryn Resources: Auryn Resources is a junior mining exploration company focused on delivering shareholder value through project acquisition and development. The Company's management team is highly experienced with an impressive track record of success in the discovery, development, financing and monetizing of mining assets for shareholders.
Forward Looking Information
This release includes certain statements that may be deemed "forward-looking statements". Forward-looking information is information that includes implied future performance and/or forecast information including information relating to, or associated with, exploration and or development of mineral properties. These statements or graphical information involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of the Company to be materially different (either positively or negatively) from any future results, performance or achievements expressed or implied by such forward-looking statements.
Disclaimer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
On Behalf of the Board
Shawn Wallace, President, CEO and Director
Forward Looking Information
This release includes certain statements that may be deemed "forward-looking statements". Forward-looking information is information that includes implied future performance and/or forecast information including information relating to, or associated with, exploration and or development of mineral properties. These statements or graphical information involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of the Company to be materially different (either positively or negatively) from any future results, performance or achievements expressed or implied by such forward-looking statements.
Disclaimer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Figures 1-7 are available at the following address:http://media3.marketwire.com/docs/1057475e_Figures_1_7.pdf
778.729.0600
778.729.0650
TF 1.800.863.8655