Category: Silver / Gold

Rye Patch Gold Drills 25 Feet Grading 2.2 Ounces/Ton Au at Lincoln Hill

Rye Patch Gold Corp. (TSX VENTURE:RPM)(TSX VENTURE:RPM.WT) ("Rye Patch" or the "Company") is excited to release the assay results from the Company's exploration drilling program on the Lincoln Hill-Gold Ridge project. The exploration program cut multi-ounce gold and silver intersections in drillhole LR-013 including 25 feet grading 2.2 ounces/ton gold from 90 to 115 feet downhole. In addition, there were numerous significant gold intervals encountered in the program. A total of 8,375 feet (2,550 metres) in 18 reverse circulation drillholes were completed. Table 1 summarizes drill interval results, using a 0.01 opt (0.34 g/t) cutoff for intervals greater than 10 feet (3 metres), for drillholes LR-001 to LR-018.


--------------------------------------------------------------------------
TABLE 1: GOLD RIDGE-LINCOLN HILL PROJECT: 2008 REVERSE CIRCULATION DRILL
PROGRAM
--------------------------------------------------------------------------
                                          Drillhole                  Total
               Target       Au       Ag    interval    From     To   Depth
Drillhole        Area   oz/ton   oz/ton        feet    feet   Feet   (feet)
--------------------------------------------------------------------------
LR-001     Gold Ridge    0.011    0.289          20     235    255     600
--------------------------------------------------------------------------
LR-002     Gold Ridge                               NSV                400
--------------------------------------------------------------------------
LR-003   Lincoln Hill    0.040    0.213          15     135    150
------------------------------------------------------------------
LR-003   Lincoln Hill    0.017    0.140          20     190    210     350
------------------------------------------------------------------
LR-003   Lincoln Hill    0.028    0.158          10     245    255
--------------------------------------------------------------------------
LR-004   Lincoln Hill    0.012    0.050          20     225    245     350
--------------------------------------------------------------------------
LR-005   Lincoln Hill    0.011    0.054          10      10     20     550
--------------------------------------------------------------------------
LR-006   Lincoln Hill    0.018    0.115          15       0     15
------------------------------------------------------------------
LR-006   Lincoln Hill    0.012    0.196          30      95    125     550
------------------------------------------------------------------
LR-006   Lincoln Hill    0.015    0.047          35     265    300
--------------------------------------------------------------------------
LR-007   Lincoln Hill    0.012    0.378          35      50     85     400
------------------------------------------------------------------
LR-008   Lincoln Hill    0.013    0.232          10      95    105     380
--------------------------------------------------------------------------
LR-009   Lincoln Hill    0.030    0.248          40      45     85
------------------------------------------------------------------
    Including            0.118    0.117           5      60     65
------------------------------------------------------------------
LR-009   Lincoln Hill    0.011    0.275          15     115    130
------------------------------------------------------------------
LR-009   Lincoln Hill    0.053    1.656          45     150    195     370
------------------------------------------------------------------
    Including            0.127    0.245           5     150    155
------------------------------------------------------------------
    Including            0.085    6.329          10     180    190
--------------------------------------------------------------------------
LR-010   Lincoln Hill    0.025    7.426          30      25     55
------------------------------------------------------------------     500
LR-010   Lincoln Hill    0.016    1.808          10      70     80
--------------------------------------------------------------------------
LR-011   Lincoln Hill    0.010    3.121          10     275    285     285
--------------------------------------------------------------------------
LR-012   Lincoln Hill    0.011    0.155          45     230    275     500
--------------------------------------------------------------------------
LR-013   Lincoln Hill    0.792    1.000          70      75    145
------------------------------------------------------------------
    Including            2.200    2.400          25      90    115
------------------------------------------------------------------     525
LR-013   Lincoln Hill    0.011    1.000          30     325    355
------------------------------------------------------------------
LR-013   Lincoln Hill    0.025    1.100          20     390    410
--------------------------------------------------------------------------
LR-014   Lincoln Hill    0.033    0.699          15      70     85
------------------------------------------------------------------     400
LR-014   Lincoln Hill    0.020    1.125          15     130    145
--------------------------------------------------------------------------
LR-015   Lincoln Hill                               NSV                245
--------------------------------------------------------------------------
LR-016   Lincoln Hill                               NSV                500
--------------------------------------------------------------------------
LR-017   Lincoln Hill    0.015    0.049          15     225    240
------------------------------------------------------------------
LR-017   Lincoln Hill    0.022    0.098          35     330    365
------------------------------------------------------------------
LR-017   Lincoln Hill    0.025    0.023          10     455    465     970
------------------------------------------------------------------
LR-017   Lincoln Hill    0.029    0.830          15     855    870
--------------------------------------------------------------------------
LR-018   Lincoln Hill    0.069    0.171          55      75    130
------------------------------------------------------------------
    Including            0.196    0.201          15      90    105
------------------------------------------------------------------
LR-018   Lincoln Hill    0.034    0.324          45     155    200     500
------------------------------------------------------------------
LR-018   Lincoln Hill    0.010    0.149          45     215    260
------------------------------------------------------------------
LR-018   Lincoln Hill    0.011    0.932          30     295    320
--------------------------------------------------------------------------
NSV equals No Significant Values                      TOTAL FOOTAGE  8,375


The Lincoln Hill drilling intersected significant gold and silver assays; however, several drillholes had significant silver assays that did not make the rigorous cut-off criteria of Table 1 because gold values are below the gold cut-off grade. These drillholes include LR-010 which cut 75 feet grading 3.396 opt Ag starting at 25 feet, drillhole LR-016 which intersected 3 zones - 55 feet grading 0.605 opt Ag, 45 feet grading 1.059 opt Ag, and 25 feet grading 1.152 opt Ag starting at 15, 140, and 330 feet respectively. Similar silver zones were also encountered in drillholes LR-007, LR-011 and LR-012.

Drilling completed at the adjacent pediment zone located within the Gold Ridge portion of the property indicates a potential new discovery. The pediment target intersected mineralized Tertiary fanglomerate similar to the Colado deposit at Wilco. This target has never been addressed and offers potential for a new discovery on the project. A drillhole location map is available on the company's website at www.ryepatchgold.com.

"These are truly phenomenal results for our first drill program on the Lincoln Hill - Gold Ridge property. The new drill intercepts on the Lincoln Hill target show the gold and silver mineralization are related to northeast structures that contain significant high-grade gold and silver values. The pediment target located on the west side of the property is within a similar geologic environment as the Colado deposit located at Wilco and could prove to have significant size. With Lincoln Hill-Gold Ridge and Wilco located within 20km of each other along easy access, the potential exists for a mining district with multiple mining operations. Similar examples exist in Nevada where a single operator has several deposits within a radius of a single mill and administration. Without getting ahead of ourselves, this drilling certainly demonstrates the merits of the project, and additional work is very much warranted", exclaimed Rye Patch's CEO and President, William C. (Bill) Howald.

At this time drill rigs are operating at Wilco and Jessup. These programs are scheduled to be completed at the end of September. The Company will have additional drill results for Wilco and Jessup over the next 10 weeks.

As released on the Company's Wilco project on May 12, 2008, and on the Jessup project in December 11, 2007, Rye Patch Gold now holds 779,517 ounces of gold and gold equivalent in the measured and indicated category plus 1,151,776 ounces of gold and gold equivalent in the inferred category. The table below summarizes the resources for Rye Patch Gold's advance projects.


Table 2: Rye Patch Gold's NI43-101 Gold Resource Inventory
--------------------------------------------------------------------------
RYE PATCH GOLD RESOURCES
--------------------------------------------------------------------------
                                                                      Con-
                                                                    tained
                                                  Con-      Con-      Gold
                                Gold  Silver    tained    tained    & Gold
           Resource      Tons  Grade   Grade      Gold    Silver     Equiv.
Property Category(1) (X 1,000)   opt     opt    Ounces    Ounces  Ounces(3)
--------------------------------------------------------------------------
Wilco(2)   Measured     8,091  0.018      NC   146,701        NC   146,701
          Indicated    32,950  0.015      NC   478,816        NC   478,816
           Inferred    99,978  0.011      NC 1,124,776        NC 1,124,776
--------------------------------------------------------------------------
Jessup(2)  Measured         0      0       0         0         0         0
          Indicated     5,423  0.022    0.31   120,000 1,655,000   154,000
           Inferred     1,265  0.017    0.23    22,000   286,000    27,000
--------------------------------------------------------------------------
                   Total Measured Resources    146,701         0   146,701
                   Total Indicated Resources   598,816 1,655,000   632,816
                   Total Inferred Resources  1,146,776   286,000 1,151,776
--------------------------------------------------------------------------
(1) Conforms to 43-101 definitions for resources. All numbers are rounded.
(2) Cutoff grade for Willard Measured and Indicated resource is reported at
    0.0056 opt Au for oxide mineralisation and 0.042 opt Au for sulphide
    mineralisation. The Inferred resource is reported at 0.0056 opt Au for
    oxide, sulphide and carbonaceous ore types; however, a higher opt Au
    cut-off grade may be required to upgrade the inferred resource to the
    measured and indicated resource category. Cutoff grade for Jessup is
    0.01 oz Au/t for oxide mineralisation, 0.015 oz Au/t for mixed
    material, and 0.025 oz Au/ton for all unoxidised material;
(3) Jessup Resource includes Au equivalent ounces (50g/t Ag equals 1g/t
    Au). NC equals not calculated


Mr. William Howald, AIPG Certified Professional Geologist #11041, Rye Patch Gold's CEO and President, is the Qualified Person as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.

Mr. Shea Clark-Smith is overseeing the gold assay and geochemical quality control and assurance programs for Rye Patch Gold's drill programs at Wilco, Jessup and Lincoln Hill. He is responsible for creating, administering, and monitoring sample preparation and analytical QA/QC procedures for the drilling program. In sum, the QA/QC procedures will provide several measures of data quality and assure the Company that the data is representative of the original sample.

Rye Patch Gold maintains a strict quality control program at all of its projects. ALS Chemex collects the Wilco, Lincoln Hill-Gold Ridge, and Jessup drill samples onsite and transports the samples directly to the ALS Chemex's preparation and analysis facility located in Reno, Nevada. Analyses are conducted on 1-assay ton prepped samples with gold determined using industry standard fire assay methods, with an atomic absorption finish.

Rye Patch Gold Corp. is a Nevada-focused and discovery-driven company building a sizeable inventory of gold resource assets in the mining friendly state of Nevada, USA. The Company's seasoned management team is engaged in acquisition, exploration and development of quality resource-based gold projects. Rye Patch Gold is developing its primary assets - the advanced-stage Wilco project located within the Humboldt Gold Trend in west-central Nevada and the Jessup project in Churchill County, Nevada. The Company is seeking gold opportunities that continue to create shareholder value and leverage the gold price. The Company's goal is to have 5-million ounces of gold inventory within the next 3 years. For more information about Rye Patch Gold, please visit our website at www.ryepatchgold.com.

On behalf of the Board of Directors

William C. (Bill) Howald, CEO & President

SOURCE: Rye Patch Gold Corp.

Rye Patch Gold Corp.
Karen Robb
Manager, Investor Relations
(604) 638-1588
(604) 638-1589 (FAX)
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.ryepatchgold.com
Renmark Financial Communications Inc.
Christine Stewart
Senior Account Manager
(416) 644-2020
(416) 644-2021 (FAX)
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.renmarkfinancial.com