The phase 2 drill program has been designed with the intent of demonstrating that the molybdenum deposit can be increased significantly in size. The drill program will consist of up to 16 holes totaling approx. 3000 metres to extend the known molybdenum mineralization along both open ends of the deposit. The plan is to define molybdenum mineralization to a vertical depth of 100 metres, as this would conform to open pit design parameters.
- Published: 02 June 2008
- Written by butch