Osisko Metals Files Bathurst Mining Camp Technical Report

MONTREAL, April 08, 2019  -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX‑V: OM; FRANKFURT: OB5) announces that further to its news release dated February 20, 2019 announcing the maiden Mineral Resource Estimate for its 100% owned Bathurst Mining Camp Project (the “BMC”) incorporating the Key Anacon Main and Titan Deposits as well as the Gilmour South Deposit, the Company has today filed the associated independent technical report supporting the earlier disclosure of the Inferred and Indicated Mineral Resource estimate for the BMC. The report, entitled “NI 43-101 Maiden Resource Estimate for the Bathurst Mining Camp Project” is dated April 4, 2019 with an effective date of February 20, 2019 and was prepared by Pierre Desautels, P.Geo., of AGP Mining Consultants Inc.  The properties that are the subject of the technical report are located in the eastern portion of the BMC, south of the city of Bathurst, New Brunswick, Canada.
Read more: Osisko Metals Incorporated ( OM )

New Geological Analysis of the Brunswick Camp Generates Greenfield Exploration Targets

MONTREAL, March 25, 2019  -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; FRANKFURT: OB5) is pleased to announce that it has completed its innovative geological analysis of the Key Anacon deposit and the Bathurst Mining Camp (“BMC”) yielding an initial ten (10) new greenfield exploration targets located along 72 kilometres of strike length of the Brunswick Horizon that is now 100% owned by the Company, following recent staking in the vicinity of the Key Anacon and Gilmour South deposits, and the former producing Brunswick No. 6 and No. 12 mines. All targets are between surface and 200 metres vertical depth and will be drill-tested in 2019 (see Figure 1).
Read more: Osisko Metals Incorporated ( OM )

Vanadium One Continues to Report Positive Drilling Results at its Mont Sorcier Iron Ore Deposit

TORONTO, ON /  March 13, 2019 / Vanadium One Energy Corp. (the "Company") (TSXV:VONE), is pleased to release further assay results for 3 holes from its 2018 fall drilling program at its 100% owned Mont Sorcier Iron Ore Project, near Chibougamau, Quebec. The final 3 holes were drilled in the South Zone, and again, drilling intersected significant continuous mineralization throughout each hole, with Hole MSS-18-18 returning an intersection of 243 meters of concentrate grading 65.2% Fe and 0.50% Vanadium Pentoxide (V2O5) within the Iron formation, using the Davis Tube Test (DTT).
 
On average, across the three holes, the content of Vanadium Pentoxide (V2O5) in magnetite concentrate prepared through DTT analysis is 0.57%, with an average Iron (Fe) content of 64.5% across 548 meters of drill core. This includes composite sample peaks of up to 1.00% V2O5 over 40 meters in drill hole MSS-18-20, as shown in Table 1. At the Company's Mont Sorcier Project, higher grade zones of vanadium pentoxide are found regularly throughout the iron formation in both South and North Zones.
Read more: Vanadium One Energy Corp ( VONE )

Osisko Metals Intersects 12.64% Zinc + Lead Over 20.70 Metres at Key Anacon – Mineral Resource Estimate Expected in Q1

MONTREAL, Feb. 07, 2019 -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; FRANKFURT: OB5) is pleased to announce assay results from 10 drill holes from the Main Zone of its wholly owned Key Anacon project, located 20 km south of the city of Bathurst, New Brunswick.
 
Two drill holes targeted the core of the Main Zone in order to confirm historical drill results. Drill hole KAMZ-18-27intersected 20.70 metres of massive sulphides grading 7.92% zinc, 4.72% lead, 0.19% copper and 185.39 g/t silver (see Main Zone Longitudinal map and Table 1).  Additionally, drill hole KAMZ-18-28 drilled 8.86 metres grading 9.13% zinc, 3.61% lead, 0.01% copper, and 132.87 g/t silver.
 
Table 1: Highlights of Significant Zinc-Lead and Copper intercepts; full details in Tables 2 and 3.
Read more: Osisko Metals Incorporated ( OM )

Chakana Intersects 22.8 Metres With 2.93 g/t Gold, 1.37% Copper, and 1,283.2 g/t Silver (21.80 g/t Au_EQ, 14.29% Cu_EQ) at Breccia Pipe 6

VANCOUVER, British Columbia, Feb. 07, 2019 -- Chakana Copper Corp. (TSX-V: PERU; OTC: CHKKF; FWB: 1ZX) (the “Company” or “Chakana”), is pleased to release initial drill results from Breccia Pipe 6 (Bx 6) at the Soledad copper-gold-silver project in central Peru. Bx 6 is located 500 metres north of Bx 5 and 1 km northwest of Bx 1 and is the northernmost and highest elevation outcropping breccia pipe identified to date in the Soledad cluster. There are seventeen confirmed breccia pipes on the Soledad project, twelve of which occur in the Soledad cluster, along with twelve other targets with distinctive alteration that is consistent with the alteration encountered adjacent to breccia pipes in previous drilling (Fig. 1). Four of the seventeen confirmed pipes have been drilled to date.
Read more: Chakana Copper Corp ( PERU )

Videos / Webinars

View all videos