- Published: 24 April 2019
- Written by Editor
Osisko Metals drills 12.17m of 9.4% Zn+Pb at Pine Point
The M-40 area contains six modelled pits in the reported current mineral resource estimate but also exhibits exploration potential for continuous high-grade mineralization between the modelled pits over a strike length of 1,070 metres. This area was poorly drilled during historical drill programs and geological evidence suggests two parallel tabular deposits to be further explored. Other high-grade intersections are noted in the attached tables.
All intersections are within a flat-lying tabular-style deposit type and all intercepts are located above 60-metre vertical depth. Composite assay details are provided in the attached table, and please refer to the augmented press release posted on SEDAR and on the Osisko Metals website for drill hole collar information related to this disclosure.
SELECTED DRILL HIGHLIGHTS From To Width Zinc Lead Lead + zinc Hole name Zone Area metres metres metres % % % M40-18-PP-023 East Mill M40 38.20 53.60 15.40 6.15 0.92 7.07 M40-18-PP-029 East Mill M40 43.05 51.10 8.05 6.21 2.55 8.76 M40-18-PP-034 East Mill M40 32.00 46.00 14.00 6.09 0.60 6.69 M40-18-PP-051 East Mill M40 40.00 45.00 5.00 5.31 6.92 12.23 M40-18-PP-072 East Mill M40 41.76 53.93 12.17 8.16 1.24 9.40 M40-18-PP-077 East Mill M40 38.40 48.00 9.60 4.95 1.06 6.56 M40-18-PP-098 East Mill M40 32.00 38.50 6.50 9.76 1.35 11.11 M40-18-PP-101 East Mill M40 45.81 50.23 4.42 8.76 5.30 14.06 M40-18-PP-128 East Mill M40* 23.00 29.00 6.00 6.12 4.31 10.43 M40-18-PP-138 East Mill M40* 25.39 29.22 3.83 10.84 6.91 17.75 M40-18-PP-140 East Mill M40* 27.00 32.37 5.37 10.60 1.84 12.44 L37-17-PP-001 East Mill M40* 31.55 34.70 3.15 5.87 2.73 8.60 * Exploration intercepts outside of modelled pits.
Jeff Hussey, president and chief executive officer of Osisko Metals, commented: "In 2019, we will be focused on exploration and the discovery of new mineralization at Pine Point. We are excited about and looking forward to the first airborne gravity survey to be flown at Pine Point and it is planned for July, 2019. This type of survey is relatively new and is the right tool for Pine Point mineralization that is not conductive nor magnetic; but it has a good density contrast and that is what the gravity survey can detect. This key survey will add significant data to our compilation and digitization of historical data. Of particular interest is the exploration potential around the current M-40 resource modelled pits that could significantly expand the currently outlined high-grade mineralization."
The M-40 area is part of the East Mill zone and the various modelled pits are illustrated in above-referenced maps. Tabular mineralization in which the current resources occur are within two parallel trends. The northernmost trend has a strike length of 1.57 kilometres extending to the west from the previously mined L-37 open pit that still contains high-grade mineralization in the western pit wall. It has a lateral width of approximately 450 metres. The southernmost trend has a known mineralized strike length of 270 metres, a lateral width of 200 metres and is open for further exploration to the southwest.
The company notes that the westernmost modelled pit in the referred map is in the immediate vicinity of the historical M-40 deposit that was partially mined underground by Cominco Ltd. and produced 350,870 tonnes of 5.5 per cent zinc and 2.2 per cent lead. The westernmost modelled pit is located outside the previously mined underground area. A portion of the drilling in this release was directed at evaluating the pillars left unmined by Cominco and exploring the extensions to the deposit beyond the previously mined area.
About Osisko Metals Inc.
The company controls Canada's two premier historical zinc mining camps: the Pine Point mining camp (PPMC), located on the south shore of Great Slave Lake in the Northwest Territories, near established infrastructure, paved highway access, and with 100 kilometres of mine haulage roads and power substation already in place. The PPMC currently hosts a National Instrument 43-101 inferred mineral resource of 38.4 million tonnes grading 4.58 per cent zinc and 1.85 per cent lead, making it the largest near-surface, pit-constrained zinc deposit in Canada (please refer to the SEDAR-filed amended technical report for further information). The 2018 to 2019 drill holes, once fully assayed, will be incorporated into the database with the objective of issuing a new resource estimate in the second half of 2019. The Bathurst mining camp (BMC), located in northern New Brunswick, with NI 43-101 indicated mineral resources of 1.96 million t grading 5.77 per cent zinc, 2.38 per cent lead, 0.22 per cent copper and 68.9 g/t silver (9.00 per cent ZnEq) and inferred mineral resources of 3.85 million t grading 5.34 per cent zinc, 1.49 per cent lead, 0.32 per cent copper and 47.7 g/t silver (7.96 per cent ZnEq) in the Key Anacon and Gilmour South deposits.
Note regarding mineral resources and qualified persons
For Pine Point, the above-mentioned inferred mineral resource conforms to National Instrument 43-101 standards. These mineral resources were reported by the company on Dec. 6, 2018, and the independent qualified person for the resource estimate, as defined by NI 43-101 guidelines, is Pierre-Luc Richard, PGeo, of BBA Inc.
For the Bathurst camp, the above-mentioned inferred and indicated mineral resource conforms to National Instrument 43-101 standards. These mineral resources were reported by the company on Feb. 20, 2019, and the independent qualified person for the resource estimate, as defined by NI 43-101 guidelines, is Pierre Desautels, PGeo, of AGP Mining Consultants Inc.
Stanley G. Clemmer, PGeo, is registered in the Northwest Territories and is chief geologist for Pine Point Mining Ltd., a wholly owned subsidiary of Osisko Metals. He is the qualified person responsible for the technical data reported in this news release.
Quality assurance/quality control
Osisko Metals adheres to a strict quality assurance and quality control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to its core facility in Hay River, NWT, where they were logged and sampled. Samples selected for assay were shipped via secure transportation to the ALS Canada Ltd.'s preparation facility in Yellowknife. Pulps were analyzed at the ALS Canada Ltd. facility in North Vancouver, B.C. All samples are analyzed by four-acid digestion followed by both ICP-AES and ICP-MS for ultratrace level detection of a multielement suite with a 1-per-cent upper detection limit for base metals. Samples reporting over 1 per cent for Zn and 1 per cent for Pb are analyzed by assay grade four-acid digestion and ICP-AES analysis with an upper detection limit of 30 per cent and 20 per cent respectively. Samples reporting Zn over 30 per cent and or Pb over 20 per cent are analyzed by traditional titration.
COMPOSITE ASSAY RESULTS Drilled True Lead + From To width width Zinc Lead zinc Hole name Zone Area m m m m % % % M40-18-PP-007 East Mill M-40 No significant values M40-18-PP-009 East Mill M-40 45.85 54.20 8.35 6.84 1.96 0.36 2.32 M40-18-PP-010 East Mill M-40 36.91 40.46 3.55 3.55 5.05 0.79 5.84 M40-18-PP-014 East Mill M-40 36.09 37.65 1.56 1.56 2.10 0.94 3.04 M40-18-PP-014 East Mill M-40 40.82 41.26 0.44 0.44 7.53 4.77 12.30 M40-18-PP-015 East Mill M-40 39.63 40.16 0.53 0.53 4.32 0.75 5.07 M40-18-PP-017 East Mill M-40 38.30 38.80 0.50 0.50 2.61 0.48 3.09 M40-18-PP-017 East Mill M-40 42.00 46.00 4.00 4.00 1.07 0.25 1.32 M40-18-PP-018 East Mill M-40 38.71 41.00 2.29 2.29 9.99 2.01 12.00 M40-18-PP-023 East Mill M-40 38.20 53.60 15.40 15.40 6.15 0.92 7.07 M40-18-PP-024 East Mill M-40 39.50 49.00 9.50 9.50 2.69 0.34 3.03 M40-18-PP-025 East Mill M-40 39.36 40.36 1.00 1.00 5.37 3.53 8.90 M40-18-PP-025 East Mill M-40 51.00 53.00 2.00 2.00 0.90 0.22 1.12 M40-18-PP-028 East Mill M-40 42.06 44.36 2.30 2.30 2.87 0.35 3.22 M40-18-PP-029 East Mill M-40 43.05 51.10 8.05 6.59 6.21 2.55 8.76 M40-18-PP-030 East Mill M-40 37.75 39.01 1.26 1.26 2.58 7.30 9.89 M40-18-PP-033 East Mill M-40 39.74 40.20 0.46 0.38 1.35 0.54 1.89 M40-18-PP-034 East Mill M-40 32.00 46.00 14.00 14.00 6.09 0.60 6.69 M40-18-PP-036 East Mill M-40 No significant values M40-18-PP-038 East Mill M-40 38.45 39.18 0.73 0.73 0.81 0.38 1.20 M40-18-PP-039 East Mill M-40 46.20 49.60 3.40 2.79 8.27 1.23 9.50 M40-18-PP-040 East Mill M-40 45.02 46.02 1.00 0.87 2.30 1.43 3.73 M40-18-PP-041 East Mill M-40 47.50 56.50 9.00 7.37 2.72 0.52 3.25 M40-18-PP-042 East Mill M-40 38.47 40.16 1.69 1.69 2.54 1.35 3.89 M40-18-PP-042 East Mill M-40 42.55 43.37 0.82 0.82 4.36 0.67 5.03 M40-18-PP-042 East Mill M-40 44.51 46.26 1.75 1.75 3.38 0.51 3.89 M40-18-PP-043 East Mill M-40 44.50 46.70 2.20 1.99 5.70 0.91 6.62 M40-18-PP-044 East Mill M-40 47.56 49.06 1.50 1.36 5.11 1.32 6.43 M40-18-PP-045 East Mill M-40 39.01 43.00 3.99 3.99 1.64 0.56 2.20 M40-18-PP-046 East Mill M-40 50.20 51.35 1.15 0.81 8.13 4.27 12.40 M40-18-PP-046 East Mill M-40 62.10 64.56 2.46 1.74 3.59 2.96 6.55 M40-18-PP-047 East Mill M-40 44.34 49.30 4.96 4.96 8.59 0.71 9.30 M40-18-PP-047 East Mill M-40 53.65 54.25 0.60 0.60 1.84 0.24 2.08 M40-18-PP-048 East Mill M-40 No significant values M40-18-PP-049 East Mill M-40 42.07 48.97 6.90 6.48 5.12 0.61 5.73 M40-18-PP-050 East Mill M-40 44.15 46.15 2.00 1.93 1.08 0.04 1.12 M40-18-PP-051 East Mill M-40 40.00 45.00 5.00 4.70 5.31 6.92 12.23 M40-18-PP-051 East Mill M-40 47.70 51.20 3.50 3.29 0.95 0.11 1.06 M40-18-PP-053 East Mill M-40 No significant values M40-18-PP-054 East Mill M-40 36.50 37.00 0.50 0.50 3.41 0.15 3.56 M40-18-PP-054 East Mill M-40 41.75 43.75 2.00 2.00 1.28 0.09 1.36 M40-18-PP-058 East Mill M-40 44.31 47.31 3.00 2.60 2.26 0.06 2.32 M40-18-PP-059 East Mill M-40 44.33 45.65 1.32 1.14 9.17 5.57 14.74 M40-18-PP-060 East Mill M-40 41.76 44.81 3.05 2.76 0.26 0.18 0.44 M40-18-PP-061 East Mill M-40 37.00 38.40 1.40 1.40 0.37 0.73 1.10 M40-18-PP-063 East Mill M-40 41.00 45.65 4.65 4.65 1.97 0.42 2.39 M40-18-PP-064 East Mill M-40 42.14 44.40 2.26 2.26 3.40 0.13 3.52 M40-18-PP-064 East Mill M-40 57.05 57.80 0.75 0.75 2.20 0.53 2.73 M40-18-PP-065 East Mill M-40 43.92 44.95 1.03 1.03 1.59 0.02 1.61 M40-18-PP-071 East Mill M-40 40.90 42.90 2.00 1.81 0.69 0.06 0.75 M40-18-PP-072 East Mill M-40 41.76 53.93 12.17 11.03 8.16 1.24 9.40 M40-18-PP-073 East Mill M-40 31.50 32.00 0.50 0.45 0.00 2.34 2.34 M40-18-PP-073 East Mill M-40 37.00 42.25 5.25 4.76 3.89 1.29 5.18 M40-18-PP-074 East Mill M-40 30.52 34.31 3.79 3.79 4.03 1.22 5.25 M40-18-PP-074 East Mill M-40 37.32 45.90 8.58 8.58 6.09 0.43 6.52 M40-18-PP-075 East Mill M-40 39.50 41.30 1.80 1.80 1.96 0.03 1.98 M40-18-PP-076 East Mill M-40 30.36 45.34 14.98 14.98 5.21 0.30 5.51 M40-18-PP-077 East Mill M-40 38.40 48.00 9.60 9.60 4.95 1.60 6.56 M40-18-PP-078 East Mill M-40 30.16 33.32 3.16 3.16 2.72 2.76 5.48 M40-18-PP-078 East Mill M-40 37.00 41.15 4.15 4.15 5.46 1.10 6.56 M40-18-PP-079 East Mill M-40 34.96 35.46 0.50 0.50 1.32 0.19 1.51 M40-18-PP-079 East Mill M-40 42.76 43.76 1.00 1.00 4.27 0.47 4.74 M40-18-PP-080 East Mill M-40 36.28 36.98 0.70 0.70 10.95 0.31 11.26 M40-18-PP-083 East Mill M-40 39.94 42.06 2.12 2.12 3.45 0.08 3.53 M40-18-PP-083 East Mill M-40 47.13 50.13 3.00 3.00 1.93 0.02 1.94 M40-18-PP-084 East Mill M-40 41.20 46.05 4.85 4.78 1.85 0.11 1.96 M40-18-PP-085 East Mill M-40 36.00 39.00 3.00 3.00 2.04 0.91 2.95 M40-18-PP-085 East Mill M-40 41.00 46.95 5.95 5.95 1.71 0.80 2.50 M40-18-PP-086 East Mill M-40 54.00 58.23 4.23 4.23 2.57 0.73 3.30 M40-18-PP-087 East Mill M-40 37.97 38.55 0.58 0.58 3.15 0.77 3.91 M40-18-PP-088 East Mill M-40 No significant values M40-18-PP-089 East Mill M-40 39.90 41.40 1.50 1.50 5.65 3.77 9.42 M40-18-PP-090 East Mill M-40 33.92 38.79 4.87 4.87 2.54 0.24 2.78 M40-18-PP-091 East Mill M-40 36.61 37.61 1.00 1.00 7.72 0.11 7.83 M40-18-PP-091 East Mill M-40 48.44 50.44 2.00 2.00 0.95 1.04 1.99 M40-18-PP-092 East Mill M-40 37.00 43.00 6.00 6.00 0.31 1.20 1.52 M40-18-PP-093 East Mill M-40 39.20 40.56 1.36 1.36 2.26 0.14 2.41 M40-18-PP-094 East Mill M-40 30.67 32.62 1.95 1.95 4.38 1.04 5.42 M40-18-PP-094 East Mill M-40 35.43 39.07 3.64 3.64 7.79 1.13 8.92 M40-18-PP-095 East Mill M-40 35.45 37.45 2.00 2.00 5.08 1.38 6.46 M40-18-PP-096 East Mill M-40 31.70 32.50 0.80 0.80 1.46 0.16 1.62 M40-18-PP-096 East Mill M-40 36.00 38.65 2.65 2.65 4.43 0.39 4.82 M40-18-PP-097 East Mill M-40 37.51 45.51 8.00 8.00 2.00 0.85 2.85 M40-18-PP-098 East Mill M-40 32.00 38.50 6.50 6.50 9.76 1.35 11.11 M40-18-PP-098 East Mill M-40 46.75 49.25 2.50 2.50 17.58 2.24 19.83 M40-18-PP-099 East Mill M-40 38.76 39.07 0.31 0.31 1.26 0.09 1.35 M40-18-PP-100 East Mill M-40 38.17 42.72 4.55 4.55 2.54 1.67 4.21 M40-18-PP-101 East Mill M-40 45.81 50.23 4.42 4.42 8.76 5.30 14.06 M40-18-PP-102 East Mill M-40 38.40 40.06 1.66 1.66 3.78 1.67 5.44 M40-18-PP-103 East Mill M-40 39.75 42.79 3.04 3.04 5.71 1.33 7.05 M40-18-PP-105 East Mill M-40 37.08 38.60 1.52 1.52 0.64 1.36 2.00 M40-18-PP-105 East Mill M-40 40.18 42.27 2.09 2.09 2.81 0.43 3.25 M40-18-PP-106 East Mill M-40 40.58 41.58 1.00 0.98 0.53 2.63 3.16 M40-18-PP-106 East Mill M-40 42.58 43.58 1.00 0.98 3.98 2.21 6.19 M40-18-PP-107 East Mill M-40 42.04 42.62 0.58 0.58 13.75 9.16 22.91 M40-18-PP-108 East Mill M-40 44.81 47.85 3.04 3.04 1.38 0.01 1.39 M40-18-PP-111 East Mill M-40 No significant values M40-18-PP-112 East Mill M-40 36.91 38.68 1.77 1.77 4.22 0.91 5.13 M40-18-PP-114 East Mill M-40 33.45 35.28 1.83 1.83 3.48 0.92 4.40 M40-18-PP-115 East Mill M-40 No significant values M40-18-PP-116 East Mill M-40 No significant values M40-18-PP-117 East Mill M-40 46.26 47.10 0.84 0.84 10.35 2.31 12.66 M40-18-PP-122 East Mill M-40 No significant values M40-18-PP-133 East Mill M-40 44.80 49.90 5.10 5.10 1.91 0.19 2.10 L37-17-PP-001 East Mill M-40* 31.55 34.70 3.15 3.15 5.87 2.73 8.60 M40-18-PP-123 East Mill M-40* 23.00 28.00 5.00 5.00 6.49 1.47 7.96 M40-18-PP-124 East Mill M-40* No significant values M40-18-PP-125 East Mill M-40* No significant values M40-18-PP-126 East Mill M-40* 26.50 27.70 1.20 1.20 8.19 0.11 8.30 M40-18-PP-127 East Mill M-40* 23.54 29.54 6.00 6.00 3.13 0.29 3.42 M40-18-PP-128 East Mill M-40* 23.00 29.00 6.00 6.00 6.12 4.31 10.43 M40-18-PP-129 East Mill M-40* 24.42 29.14 4.72 4.72 3.35 0.40 3.74 M40-18-PP-130 East Mill M-40* 21.50 25.91 4.41 4.41 2.79 0.85 3.64 M40-18-PP-135 East Mill M-40* 22.40 25.90 3.50 3.50 19.71 5.13 24.84 M40-18-PP-136 East Mill M-40* No significant values M40-18-PP-137 East Mill M-40* 26.87 29.43 2.56 2.56 5.24 0.23 5.47 M40-18-PP-138 East Mill M-40* 25.39 29.22 3.83 3.83 10.84 6.91 17.75 M40-18-PP-139 East Mill M-40* 26.45 30.90 4.45 4.45 1.18 0.16 1.34 M40-18-PP-140 East Mill M-40* 27.00 32.37 5.37 5.37 10.60 1.84 12.44 M40-18-PP-141 East Mill M-40* 27.34 29.64 2.30 2.30 1.57 0.36 1.94 M40-18-PP-142 East Mill M-40* 29.82 30.85 1.03 1.03 7.27 1.96 9.23 M40-18-PP-143 East Mill M-40* 28.97 31.22 2.25 2.25 13.88 0.77 14.65 M40-18-PP-022 East Mill M-40m 38.80 45.41 6.61 6.61 4.19 0.98 5.16 M40-18-PP-026 East Mill M-40m 38.00 40.00 2.00 2.00 0.51 0.48 0.99 M40-18-PP-027 East Mill M-40m 40.40 44.60 4.20 4.20 3.41 0.24 3.64 M40-18-PP-031 East Mill M-40m 41.55 47.20 5.65 5.65 5.27 0.52 5.79 M40-18-PP-035 East Mill M-40m 41.50 46.25 4.75 4.75 1.75 0.19 1.94 M40-18-PP-037 East Mill M-40m 37.59 41.76 4.17 3.92 2.48 0.93 3.41 M40-18-PP-052 East Mill M-40m 31.49 32.49 1.00 1.00 1.39 0.06 1.44 M40-18-PP-052 East Mill M-40m 36.49 41.05 4.56 4.56 4.19 4.18 8.37 M40-18-PP-052 East Mill M-40m 44.69 47.38 2.69 2.69 12.35 6.83 19.18 M40-18-PP-055 East Mill M-40m 30.85 39.90 9.05 9.05 8.73 3.74 12.47 M40-18-PP-056 East Mill M-40m 38.65 39.65 1.00 1.00 1.27 0.44 1.71 M40-18-PP-057 East Mill M-40m 59.00 59.55 0.55 0.55 5.69 0.75 6.44 M40-18-PP-062 East Mill M-40m 38.41 42.81 4.40 4.33 6.73 3.52 10.25 M40-18-PP-066 East Mill M-40m No significant values M40-18-PP-067 East Mill M-40m 41.20 43.91 2.71 2.71 5.81 0.59 6.41 M40-18-PP-068 East Mill M-40m 36.00 37.12 1.12 1.12 0.04 0.95 0.99 M40-18-PP-069 East Mill M-40m 44.85 47.48 2.63 2.63 5.18 0.59 5.77 M40-18-PP-070 East Mill M-40m 43.55 44.82 1.27 1.27 3.40 0.46 3.86 M40-18-PP-070 East Mill M-40m 48.16 51.27 3.11 3.11 2.73 0.48 3.21 M40-18-PP-081 East Mill M-40m 44.50 49.02 4.52 4.45 4.30 0.63 4.93 M40-18-PP-082 East Mill M-40m No significant values M40-18-PP-104 East Mill M-40m 38.58 42.85 4.27 4.27 5.62 3.85 9.47 M40-18-PP-108 East Mill M-40m 39.65 41.65 2.00 2.00 0.41 3.18 3.59 M40-18-PP-109 East Mill M-40m 41.27 43.75 2.48 2.48 2.33 2.43 4.76 M40-18-PP-110 East Mill M-40m 39.34 41.76 2.42 2.42 1.69 1.19 2.88 M40-18-PP-113 East Mill M-40m 34.98 46.65 11.67 11.67 5.06 0.68 5.74 M40-18-PP-118 East Mill M-40m 45.11 46.11 1.00 1.00 3.55 0.61 4.16 M40-18-PP-119 East Mill M-40m No significant values M40-18-PP-131 East Mill M-40m 38.71 43.70 4.99 4.99 7.01 2.69 9.69 M40-18-PP-132 East Mill M-40m 38.98 42.69 3.71 3.71 2.74 0.58 3.32 M40-18-PP-133 East Mill M-40m 36.70 42.75 6.05 6.05 6.57 0.65 7.22 M40-18-PP-134 East Mill M-40m 34.66 46.76 12.10 12.10 8.05 0.64 8.69 * Outside of modelled pits. m: Within historical underground development area.
DRILL HOLE INFORMATION Hole name Area Deposit Depth m L37-17-PP-001 East Mill M-40 65.00 M40-18-PP-007 East Mill M-40 60.05 M40-18-PP-009 East Mill M-40 72.74 M40-18-PP-010 East Mill M-40 58.22 M40-18-PP-014 East Mill M-40 60.05 M40-18-PP-015 East Mill M-40 57.00 M40-18-PP-017 East Mill M-40 56.00 M40-18-PP-018 East Mill M-40 59.00 M40-18-PP-022 East Mill M-40 57.30 M40-18-PP-023 East Mill M-40 60.96 M40-18-PP-024 East Mill M-40 60.35 M40-18-PP-025 East Mill M-40 60.35 M40-18-PP-026 East Mill M-40 57.30 M40-18-PP-027 East Mill M-40 57.30 M40-18-PP-028 East Mill M-40 60.35 M40-18-PP-029 East Mill M-40 75.59 M40-18-PP-030 East Mill M-40 60.35 M40-18-PP-031 East Mill M-40 57.00 M40-18-PP-033 East Mill M-40 75.59 M40-18-PP-034 East Mill M-40 60.35 M40-18-PP-035 East Mill M-40 69.19 M40-18-PP-036 East Mill M-40 60.05 M40-18-PP-037 East Mill M-40 66.14 M40-18-PP-038 East Mill M-40 57.00 M40-18-PP-039 East Mill M-40 75.29 M40-18-PP-040 East Mill M-40 72.24 M40-18-PP-041 East Mill M-40 75.29 M40-18-PP-042 East Mill M-40 60.35 M40-18-PP-043 East Mill M-40 61.57 M40-18-PP-044 East Mill M-40 66.45 M40-18-PP-045 East Mill M-40 57.30 M40-18-PP-046 East Mill M-40 84.73 M40-18-PP-047 East Mill M-40 60.35 M40-18-PP-048 East Mill M-40 86.87 M40-18-PP-049 East Mill M-40 63.40 M40-18-PP-050 East Mill M-40 60.35 M40-18-PP-051 East Mill M-40 66.14 M40-18-PP-052 East Mill M-40 60.05 M40-18-PP-053 East Mill M-40 63.09 M40-18-PP-054 East Mill M-40 60.05 M40-18-PP-055 East Mill M-40 57.00 M40-18-PP-056 East Mill M-40 53.93 M40-18-PP-057 East Mill M-40 60.05 M40-18-PP-058 East Mill M-40 63.09 M40-18-PP-059 East Mill M-40 63.09 M40-18-PP-060 East Mill M-40 63.09 M40-18-PP-061 East Mill M-40 51.21 M40-18-PP-062 East Mill M-40 60.35 M40-18-PP-063 East Mill M-40 54.25 M40-18-PP-064 East Mill M-40 60.35 M40-18-PP-065 East Mill M-40 57.30 M40-18-PP-066 East Mill M-40 60.35 M40-18-PP-067 East Mill M-40 60.35 M40-18-PP-068 East Mill M-40 60.35 M40-18-PP-069 East Mill M-40 61.87 M40-18-PP-070 East Mill M-40 60.30 M40-18-PP-071 East Mill M-40 66.14 M40-18-PP-072 East Mill M-40 66.14 M40-18-PP-073 East Mill M-40 66.09 M40-18-PP-074 East Mill M-40 60.05 M40-18-PP-075 East Mill M-40 60.05 M40-18-PP-076 East Mill M-40 60.05 M40-18-PP-077 East Mill M-40 60.05 M40-18-PP-078 East Mill M-40 60.05 M40-18-PP-079 East Mill M-40 60.05 M40-18-PP-080 East Mill M-40 60.05 M40-18-PP-081 East Mill M-40 60.35 M40-18-PP-082 East Mill M-40 57.30 M40-18-PP-083 East Mill M-40 60.35 M40-18-PP-084 East Mill M-40 64.92 M40-18-PP-085 East Mill M-40 60.35 M40-18-PP-086 East Mill M-40 60.35 M40-18-PP-087 East Mill M-40 57.30 M40-18-PP-088 East Mill M-40 59.13 M40-18-PP-089 East Mill M-40 60.53 M40-18-PP-090 East Mill M-40 54.25 M40-18-PP-091 East Mill M-40 60.35 M40-18-PP-092 East Mill M-40 60.05 M40-18-PP-093 East Mill M-40 60.05 M40-18-PP-094 East Mill M-40 63.10 M40-18-PP-095 East Mill M-40 60.05 M40-18-PP-096 East Mill M-40 60.05 M40-18-PP-097 East Mill M-40 59.00 M40-18-PP-098 East Mill M-40 60.05 M40-18-PP-099 East Mill M-40 60.05 M40-18-PP-100 East Mill M-40 60.05 M40-18-PP-101 East Mill M-40 63.09 M40-18-PP-102 East Mill M-40 57.00 M40-18-PP-103 East Mill M-40 60.05 M40-18-PP-104 East Mill M-40 60.05 M40-18-PP-105 East Mill M-40 57.00 M40-18-PP-106 East Mill M-40 60.05 M40-18-PP-107 East Mill M-40 60.50 M40-18-PP-108 East Mill M-40 57.00 M40-18-PP-109 East Mill M-40 60.50 M40-18-PP-110 East Mill M-40 57.00 M40-18-PP-111 East Mill M-40 60.35 M40-18-PP-112 East Mill M-40 60.35 M40-18-PP-113 East Mill M-40 60.35 M40-18-PP-114 East Mill M-40 57.30 M40-18-PP-115 East Mill M-40 57.11 M40-18-PP-116 East Mill M-40 60.35 M40-18-PP-117 East Mill M-40 60.35 M40-18-PP-118 East Mill M-40 57.30 M40-18-PP-119 East Mill M-40 57.30 M40-18-PP-122 East Mill M-40 60.35 M40-18-PP-123 East Mill M-40 45.50 M40-18-PP-124 East Mill M-40 45.50 M40-18-PP-125 East Mill M-40 45.00 M40-18-PP-126 East Mill M-40 45.50 M40-18-PP-127 East Mill M-40 48.00 M40-18-PP-128 East Mill M-40 42.50 M40-18-PP-129 East Mill M-40 45.50 M40-18-PP-130 East Mill M-40 45.50 M40-18-PP-131 East Mill M-40 60.05 M40-18-PP-132 East Mill M-40 60.05 M40-18-PP-133 East Mill M-40 60.05 M40-18-PP-134 East Mill M-40 57.00 M40-18-PP-135 East Mill M-40 45.50 M40-18-PP-136 East Mill M-40 48.50 M40-18-PP-137 East Mill M-40 48.50 M40-18-PP-138 East Mill M-40 48.50 M40-18-PP-139 East Mill M-40 48.50 M40-18-PP-140 East Mill M-40 48.80 M40-18-PP-141 East Mill M-40 48.50 M40-18-PP-142 East Mill M-40 48.50 M40-18-PP-143 East Mill M-40 48.50