Anfield Intersects 19.7 Meters Grading 2.47% Nickel at its Mayaniquel Project, Guatemala

Anfield Nickel Corp. (TSX VENTURE: ANF) ("Anfield") is pleased to announce new results from its ongoing drill program at its 100% owned Mayaniquel nickel laterite project located in northeastern Guatemala. The results are highlighted by continued excellent intercepts from drilling at the Nueva Caledonia deposit where two new zones have been delineated, a Southeast Zone highlighted by hole NCA10-176 that intersected 19.7 meters grading 2.47% nickel and a Southwest Zone highlighted by hole NCA10-146 that intersected 23.8 meters grading 1.48% nickel including 15 meters grading 1.81% nickel.

The latest drill results from Nueva Caledonia continue to expand the Central and Northeast zones and have intersected significant new mineralization to the southeast and southwest. The Central Zone now contains continuous mineralization over a northwesterly trending area 850 meters long and 400 meters wide.

The Northeast Zone has been expanded to 1,200 meters in a north-south direction and up to 500 meters in an east - west direction. The Central Zone remains open to the north - northwest while the limits of the Northeast Zone have now been established. Both zones appear to merge with the newly discovered Southeast and Southwest Zones. Approximately 1.5 kilometers to the west, drilling has identified a new zone of mineralization that is contiguous to and north of Hudbay Minerals Inc.'s Fenix Project's mineral resources. Assay results from the 55 holes drilled in this area are pending (see attached map).

At Nueva Concepcion, the drill program has identified nickel laterite mineralization underlying an area 1,350 meters long averaging 500 meters wide. The deposit is characterized by a continuous, thick zone of higher grade mineralization approximately 600 meters long by 300 meters wide in the south that is bounded to the south and east by basement peridotite rock and gradually thins and becomes discontinuous with lower grades in a northern and westerly direction. The program at Nueva Concepcion is now focused on in-fill drilling the Southern zone into the Indicated Resource category (see attached map).

Drilling continues to expand nickel laterite resources at the Chiis deposit and, to date, has identified mineralization over an area 1,500 meters long and up to 800 meters wide with mineralization remaining open in all directions (see attached map).

This news release includes drill results from holes NCA10-79 and NCA10-81 to NCA10-180 at Nueva Caledonia, NCO10-87 to NCO10-111 at Nueva Concepcion and holes NCC10-10 to NCC10-39 at the Chiis deposit. Significant intercepts from the latest drilling results are shown in the table below. Maps showing the location of the drill holes are attached to this news release (drill holes are currently drilled on a 100 meter by 100 meter grid pattern, except at Nueva Concepcion where in-fill drilling is being completed on nominal 70 meter centers):


-----------------------------------------------------------------------
-
Drill Hole    From (m)  To (m) Length (m)  Ni (%)   Comments
------------------------------------------------------------------------
------------------------------------------------------------------------
Nueva Caledonia Target
------------------------------------------------------------------------
NCA10-079        1.80    5.70       3.90    1.22    Caledonia Central
------------------------------------------------------------------------
NCA10-080        0.60    5.30       4.60    1.40    Caledonia NE
------------------------------------------------------------------------
NCA10-081        2.80    6.70       3.90    1.04    Caledonia Central
------------------------------------------------------------------------
NCA10-082        6.20   16.50      10.30    1.56    Caledonia NE
------------------------------------------------------------------------
  including      9.40   14.40       5.00    2.00
------------------------------------------------------------------------
NCA10-084        2.90    7.00       4.10    1.13    Caledonia Central
------------------------------------------------------------------------
NCA10-085        2.00    7.30       5.00    1.74    Caledonia NE
------------------------------------------------------------------------
  including      3.00    6.20       3.20    2.09
------------------------------------------------------------------------
NCA10-086        1.00   14.80      13.80    2.00    Caledonia Central
------------------------------------------------------------------------
  including      4.10   13.80       9.70    2.39
------------------------------------------------------------------------
NCA10-087        1.80   19.80      18.00    1.73    Caledonia NE
------------------------------------------------------------------------
  including     11.20   19.00       7.80    2.44
------------------------------------------------------------------------
NCA10-088       11.70   20.40       8.70    1.49    Caledonia Central
------------------------------------------------------------------------
  including     15.40   19.50       4.10    1.91
------------------------------------------------------------------------
NCA10-089        0.70    4.80       4.10    1.68    Caledonia Central
------------------------------------------------------------------------
  including      1.50    3.80       2.30    2.15
------------------------------------------------------------------------
NCA10-090        0.50   16.10      15.60    1.19    Caledonia NE
------------------------------------------------------------------------
  including      8.50   10.30       1.80    1.70
------------------------------------------------------------------------
NCA10-091        2.80    3.80       1.00    0.91    Caledonia Central
------------------------------------------------------------------------
  and            5.80    8.10       2.30    1.10
------------------------------------------------------------------------
NCA10-092        4.20   12.90       8.70    1.21    Caledonia Central
------------------------------------------------------------------------
  including      8.70    9.70       1.00    1.62
------------------------------------------------------------------------
NCA10-093        2.90   18.30      15.40    1.19    Caledonia NE
------------------------------------------------------------------------
  including     15.80   18.30       2.50    2.18
------------------------------------------------------------------------
NCA10-094        0.60   12.10      11.50    0.98    Caledonia Central
------------------------------------------------------------------------
NCA10-095        6.10   26.90      20.80    1.28    Caledonia NE
------------------------------------------------------------------------
  including     17.90   26.90       9.00    1.62
------------------------------------------------------------------------
NCA10-096        8.00   15.80       7.80    1.11    Caledonia Central
------------------------------------------------------------------------
  including      9.00   10.00       1.00    1.65
------------------------------------------------------------------------
NCA10-097        5.80   20.80      15.00    1.37    Caledonia NE
------------------------------------------------------------------------
  including      6.60   10.30       3.70    1.61
------------------------------------------------------------------------
  and           15.30   17.30       2.00    1.77
------------------------------------------------------------------------
NCA10-098        0.90    4.90       4.00    0.92    Caledonia Central
------------------------------------------------------------------------
NCA10-100        3.80    5.80       2.00    0.84    Caledonia NE
------------------------------------------------------------------------
  and           17.30   21.20       3.90    1.10
------------------------------------------------------------------------
  including     20.20   21.20       1.00    1.53
------------------------------------------------------------------------
NCA10-101        3.20    9.00       5.80    1.32    Caledonia SW
------------------------------------------------------------------------
  including      6.00    8.00       2.00    1.68
------------------------------------------------------------------------
NCA10-102        0.70    5.30       4.60    1.20    Caledonia NE
------------------------------------------------------------------------
NCA10-103        6.00    7.40       1.40    0.91    Caledonia NE
------------------------------------------------------------------------
  and            9.80   15.10       5.30    1.53
------------------------------------------------------------------------
  including     11.20   13.60       2.40    1.86
------------------------------------------------------------------------
NCA10-105        2.30    5.80       3.50    1.36    Caledonia NE
------------------------------------------------------------------------
NCA10-107       10.30   15.30       5.00    1.44    Caledonia SW
------------------------------------------------------------------------
  including     11.30   13.30       2.00    1.67
------------------------------------------------------------------------
NCA10-108        0.00    2.10       2.10    0.85    Caledonia NE
------------------------------------------------------------------------
NCA10-109        5.00    7.30       2.30    1.10    Caledonia SW
------------------------------------------------------------------------
NCA10-110        2.30    7.80       5.50    1.33    Caledonia NE
------------------------------------------------------------------------
  including      4.80    6.60       1.80    1.60
------------------------------------------------------------------------
  and           12.30   18.80       6.50    0.85
------------------------------------------------------------------------
NCA10-111        6.30   11.60       5.30    1.04    Caledonia SW
------------------------------------------------------------------------
  and           15.30   17.80       2.50    1.51
------------------------------------------------------------------------
  including     16.20   17.80       1.60    1.70
------------------------------------------------------------------------
NCA10-112        1.80    4.70       2.90    1.26    Caledonia NE
------------------------------------------------------------------------
NCA10-113        6.60   18.60      12.00    1.31    Caledonia SW
------------------------------------------------------------------------
  including     10.30   15.30       5.00    1.68
------------------------------------------------------------------------
NCA10-115        5.10    7.10       2.00    0.86    Caledonia SW
------------------------------------------------------------------------
  and           11.60   22.10      10.50    1.85
------------------------------------------------------------------------
  including     14.30   21.20       6.90    2.19
------------------------------------------------------------------------
NCA10-117        3.60    5.20       1.60    0.86    Caledonia NE
------------------------------------------------------------------------
NCA10-118        4.00   18.30      14.30    1.41    Caledonia SW
------------------------------------------------------------------------
  including      9.60   17.70       8.00    1.77
------------------------------------------------------------------------
NCA10-119        1.00    5.50       4.50    0.89    Caledonia NE
------------------------------------------------------------------------
NCA10-120        3.60   12.60       9.00    1.23    Caledonia SW
------------------------------------------------------------------------
NCA10-121        3.40   13.00       9.60    1.14    Caledonia NE
------------------------------------------------------------------------
NCA10-122        6.00   13.80       7.80    1.63    Caledonia SW
------------------------------------------------------------------------
  including      9.10   12.80       3.70    2.22
------------------------------------------------------------------------
NCA10-123        2.60    8.80       6.20    1.05    Caledonia NE
------------------------------------------------------------------------
NCA10-124        1.40    3.30       1.90    1.04    Caledonia SW
------------------------------------------------------------------------
NCA10-125        5.60   17.80      12.20    1.44    Caledonia NE
------------------------------------------------------------------------
  including     11.30   16.90       5.60    1.84
------------------------------------------------------------------------
NCA10-126        5.90    9.30       3.40    1.21    Caledonia SW
------------------------------------------------------------------------
  including      8.10    9.30       1.20    1.57
------------------------------------------------------------------------
NCA10-127        3.70    7.80       4.10    1.22    Caledonia SW
------------------------------------------------------------------------
  including      3.70    4.80       1.10    1.76
------------------------------------------------------------------------
NCA10-128        5.00   12.20       7.20    1.35    Caledonia NE
------------------------------------------------------------------------
  including      6.00    7.40       1.40    1.93
------------------------------------------------------------------------
  and            9.60   11.30       1.70    1.60
------------------------------------------------------------------------
NCA10-129        0.80    8.40       7.60    1.38    Caledonia SW
------------------------------------------------------------------------
  including      4.30    7.30       3.00    1.64
------------------------------------------------------------------------
NCA10-130        4.40   12.30       7.90    0.96    Caledonia NE
------------------------------------------------------------------------
NCA10-131        3.50    7.80       4.30    0.98    Caledonia SW
------------------------------------------------------------------------
NCA10-132        4.00   12.10       8.10    1.31    Caledonia SW
------------------------------------------------------------------------
  including      7.30   10.50       3.20    1.71
------------------------------------------------------------------------
NCA10-133        1.30    4.10       2.80    0.86    Caledonia NE
------------------------------------------------------------------------
NCA10-134        0.80    7.80       7.00    1.25    Caledonia SW
------------------------------------------------------------------------
NCA10-136        0.60    9.10       8.50    1.31    Caledonia SW
------------------------------------------------------------------------
NCA10-137        0.00    1.40       1.40    0.93    Caledonia NE
------------------------------------------------------------------------
  and            9.30   16.40       7.10    1.35
------------------------------------------------------------------------
  including     13.80   16.40       2.60    1.70
------------------------------------------------------------------------
NCA10-138        4.80    7.30       2.50    1.59    Caledonia SW
------------------------------------------------------------------------
  including      5.60    7.30       1.70    1.87
------------------------------------------------------------------------
NCA10-139        1.40    5.50       4.10    1.06    Caledonia Central
------------------------------------------------------------------------
NCA10-140        5.80    6.80       1.00    0.88    Caledonia NE
------------------------------------------------------------------------
  and            8.60   11.70       3.10    1.01
------------------------------------------------------------------------
NCA10-141        3.00    4.50       1.50    1.19    Caledonia SW
------------------------------------------------------------------------
NCA10-142        2.90    4.00       1.10    0.93    Caledonia SW
------------------------------------------------------------------------
NCA10-144        4.20    5.20       1.00    0.87    Caledonia SW
------------------------------------------------------------------------
NCA10-145        0.00    3.10       3.10    0.98    Caledonia NE
------------------------------------------------------------------------
  and            6.30   20.90      14.60    1.15
------------------------------------------------------------------------
  including      9.80   11.80       2.00    1.61
------------------------------------------------------------------------
NCA10-146        5.00   28.80      23.80    1.48    Caledonia SW
------------------------------------------------------------------------
  including     13.80   28.80      15.00    1.81
------------------------------------------------------------------------
NCA10-149        8.00   21.40      13.40    1.31    Caledonia NE
------------------------------------------------------------------------
  including     12.30   15.20       2.90    1.79
------------------------------------------------------------------------
  and           18.70   20.50       1.80    1.88
------------------------------------------------------------------------
NCA10-150        4.70   12.90       8.20    1.49    Caledonia SW
------------------------------------------------------------------------
  including      6.60   11.00       4.40    1.75
------------------------------------------------------------------------
NCA10-151        1.80    6.60       4.80    1.07    Caledonia SW
------------------------------------------------------------------------
NCA10-152        1.40    2.50       1.10    1.52    Caledonia SE
------------------------------------------------------------------------
NCA10-153        3.80   15.80      12.00    1.15    Caledonia NE
------------------------------------------------------------------------
NCA10-154        5.30   17.30      12.00    1.60    Caledonia SE
------------------------------------------------------------------------
  including      9.80   16.70       6.90    2.00
------------------------------------------------------------------------
NCA10-156        3.00    4.80       1.80    1.22    Caledonia NE
------------------------------------------------------------------------
NCA10-157        1.90   24.20      22.30    1.65    Caledonia SE
------------------------------------------------------------------------
  including     12.70   22.70      10.00    2.36
------------------------------------------------------------------------
NCA10-158        6.80    7.80       1.00    1.39    Caledonia SE
------------------------------------------------------------------------
NCA10-159        0.00    4.00       4.00    1.03    Caledonia NE
------------------------------------------------------------------------
  and            5.80    6.80       1.00    0.82
------------------------------------------------------------------------
NCA10-160       10.80   26.70      15.90    1.47    Caledonia SE
------------------------------------------------------------------------
  including     19.20   25.30       6.10    2.16
------------------------------------------------------------------------
  and           29.50   33.30       3.80    1.90
------------------------------------------------------------------------
NCA10-161        0.00    4.00       4.00    0.91
------------------------------------------------------------------------
NCA10-162        3.70    5.40       1.70    1.01    Caledonia SE
------------------------------------------------------------------------
NCA10-163        5.40    8.40       3.00    0.95    Caledonia SE
------------------------------------------------------------------------
  and           11.00   32.80      21.80    1.07
------------------------------------------------------------------------
  including     22.80   31.80       9.00    1.59
------------------------------------------------------------------------
  and           35.60   40.30       4.70    1.28
------------------------------------------------------------------------
NCA10-165        2.00   11.50       9.50    1.33    Caledonia SE
------------------------------------------------------------------------
  including      6.80    9.70       2.90    1.83
------------------------------------------------------------------------
NCA10-166        1.00   13.30      12.30    1.64    Caledonia SE
------------------------------------------------------------------------
  including      6.30   12.30       6.00    2.27
------------------------------------------------------------------------
NCA10-167        9.90   15.70       5.80    1.01    Caledonia SE
------------------------------------------------------------------------
  and           17.50   18.50       1.00    1.26
------------------------------------------------------------------------
  and           22.00   23.20       1.20    2.16
------------------------------------------------------------------------
NCA10-169        9.40   20.10      10.70    1.55    Caledonia SE
------------------------------------------------------------------------
  including     13.40   19.20       5.80    1.79
------------------------------------------------------------------------
NCA10-170        7.30    8.30       1.00    0.81    Caledonia SE
------------------------------------------------------------------------
  and           10.30   18.00       7.70    1.67
------------------------------------------------------------------------
  including     11.90   17.00       5.10    2.01
------------------------------------------------------------------------
NCA10-172        1.00    4.00       3.00    1.30    Caledonia SE
------------------------------------------------------------------------
  and            6.30    8.90       2.60    0.84
------------------------------------------------------------------------
NCA10-173        3.60   20.60      17.00    1.14    Caledonia SE
------------------------------------------------------------------------
  including     17.10   19.80       2.70    1.79
------------------------------------------------------------------------
NCA10-174        1.00   27.50      26.50    1.42    Caledonia SE
------------------------------------------------------------------------
  including      5.80   10.80       5.00    2.02
------------------------------------------------------------------------
  and           23.50   26.30       2.80    1.88
------------------------------------------------------------------------
  and           35.10   47.00      11.90    1.38
------------------------------------------------------------------------
  including     42.30   45.30       3.00    1.68
------------------------------------------------------------------------
NCA10-176        0.90   20.60      19.70    2.47    Caledonia SE
------------------------------------------------------------------------
NCA10-177        7.10    8.30       1.20    1.17
------------------------------------------------------------------------
NCA10-178        0.00    5.00       5.00    1.25    Caledonia SE
------------------------------------------------------------------------
  and           10.80   11.90       1.10    0.83
------------------------------------------------------------------------
NCA10-180        1.40   12.30      10.90    1.58    Caledonia SE
------------------------------------------------------------------------
  including      4.20   10.90       6.70    1.96
------------------------------------------------------------------------
------------------------------------------------------------------------
Nueva Concepcion Target
------------------------------------------------------------------------
NCO10-087        0.50    1.50       1.00    0.91    Concepcion North
------------------------------------------------------------------------
  and            6.10   29.80      23.70    1.22
------------------------------------------------------------------------
  including     21.20   24.20       3.00    1.66
------------------------------------------------------------------------
  and           27.80   28.80       1.00    1.54
------------------------------------------------------------------------
  and           37.80   39.80       2.00    0.93
------------------------------------------------------------------------
NCO10-088        9.00   21.80      12.80    0.97    Concepcion South
------------------------------------------------------------------------
NCO10-089        2.00   15.60      13.60    1.13    Concepcion South
------------------------------------------------------------------------
  including     11.80   13.80       2.00    1.79
------------------------------------------------------------------------
NCO10-090        5.40   15.20       9.80    0.95    Concepcion South
------------------------------------------------------------------------
  and           24.70   31.50       6.80    1.17
------------------------------------------------------------------------
NCO10-091        1.60   22.60      21.00    1.24    Concepcion South
------------------------------------------------------------------------
  including      4.20    5.20       1.00    1.52
------------------------------------------------------------------------
  and            7.20   11.20       4.00    1.66
------------------------------------------------------------------------
NCO10-092        7.80   15.50       7.70    1.10    Concepcion South
------------------------------------------------------------------------
  and           35.60   37.30       1.70    1.10
------------------------------------------------------------------------
NCO10-093        0.80   12.30      11.50    1.09    Concepcion North
------------------------------------------------------------------------
  and           16.30   17.80       1.50    1.18
------------------------------------------------------------------------
  and           26.30   27.30       1.00    1.12
------------------------------------------------------------------------
NCO10-094        6.10   14.40       8.30    0.98    Concepcion North
------------------------------------------------------------------------
NCO10-095        3.20    9.00       5.80    0.87    Concepcion North
------------------------------------------------------------------------
  and           13.10   14.10       1.00    0.82
------------------------------------------------------------------------
  and           18.00   21.30       3.30    1.03
------------------------------------------------------------------------
  and           24.30   25.30       1.00    0.87
------------------------------------------------------------------------
NCO10-096        6.30   16.30      10.00    0.87    Concepcion North
------------------------------------------------------------------------
NCO10-097        8.30   27.30      19.00    1.01    Concepcion North
------------------------------------------------------------------------
NCO10-098        4.30    5.30       1.00    0.93    Concepcion North
------------------------------------------------------------------------
NCO10-099        2.80   19.10      16.30    1.09    Concepcion North
------------------------------------------------------------------------
NCO10-100        3.40   13.30       9.90    0.91    Concepcion North
------------------------------------------------------------------------
  and           17.70   22.70       5.00    0.97
------------------------------------------------------------------------
NCO10-101        4.00    8.30       4.30    0.88    Concepcion North
------------------------------------------------------------------------
NCO10-102        4.10    6.10       2.00    0.92    Concepcion North
------------------------------------------------------------------------
  and            8.10   19.70      11.60    0.86
------------------------------------------------------------------------
NCO10-103        2.20    5.90       3.70    0.97    Concepcion North
------------------------------------------------------------------------
  and           16.30   17.90       1.60    0.81
------------------------------------------------------------------------
NCO10-104        1.40   13.80      12.40    0.95    Concepcion North
------------------------------------------------------------------------
  including      8.50   10.40       1.90    1.79
------------------------------------------------------------------------
NCO10-105        2.30   17.80      15.50    0.87    Concepcion North
------------------------------------------------------------------------
  and           19.50   20.60       1.10    1.03
------------------------------------------------------------------------
NCO10-108        1.80    4.30       2.50    0.97    Western Recon Target
------------------------------------------------------------------------
NCO10-111       15.00   17.50       2.50    0.87    Western Recon Target
------------------------------------------------------------------------
------------------------------------------------------------------------
Chiis Target
------------------------------------------------------------------------
NCC10-010        1.50   11.10       9.60    1.26    Chiis Central
------------------------------------------------------------------------
  including      7.10    9.10       2.00    1.89
------------------------------------------------------------------------
  and           14.80   15.90       1.10    1.05
------------------------------------------------------------------------
NCC10-011        5.70   18.10      12.40    1.04    Chiis Central
------------------------------------------------------------------------
NCC10-012        2.80    6.60       3.80    1.04    Chiis Central
------------------------------------------------------------------------
NCC10-013        5.80   10.80       5.00    0.99    Chiis Central
------------------------------------------------------------------------
NCC10-014        7.20   14.80       7.60    0.93    Chiis Central
------------------------------------------------------------------------
NCC10-015        5.60   11.70       6.10    1.34    Chiis Central
------------------------------------------------------------------------
  including      6.30    9.70       3.40    1.71
------------------------------------------------------------------------
NCC10-016        3.80    6.30       2.50    1.01    Chiis Central
------------------------------------------------------------------------
NCC10-017        1.80    6.40       4.60    1.05    Chiis Central
------------------------------------------------------------------------
NCC10-018        2.10    3.10       1.00    1.29    Chiis Central
------------------------------------------------------------------------
NCC10-019       14.00   17.00       3.00    1.24    Chiis Central
------------------------------------------------------------------------
  and           19.80   30.30      10.40    1.54
------------------------------------------------------------------------
  including     23.70   28.90       5.20    1.84
------------------------------------------------------------------------
NCC10-020       10.30   13.00       2.70    1.30    Chiis Central
------------------------------------------------------------------------
NCC10-021        5.80   33.30      27.50    1.23    Chiis Central
------------------------------------------------------------------------
  including     20.10   24.90       4.80    1.48
------------------------------------------------------------------------
NCC10-022        7.00   12.40       5.40    0.99    Chiis Central
------------------------------------------------------------------------
NCC10-023        9.50   32.30      22.80    1.30    Chiis Central
------------------------------------------------------------------------
  including     13.10   21.10       8.00    1.77
------------------------------------------------------------------------
NCC10-024        2.10   28.20      26.10    1.13    Chiis Central
------------------------------------------------------------------------
NCC10-025        5.70    9.30       3.60    1.20    Chiis Central
------------------------------------------------------------------------
NCC10-026        0.00    3.70       3.70    1.28    Chiis SW
------------------------------------------------------------------------
NCC10-027        5.10   13.80       8.70    1.52    Chiis SW
------------------------------------------------------------------------
  including      7.40   13.80       6.40    1.75
------------------------------------------------------------------------
  and           17.30   21.40       4.10    0.84
------------------------------------------------------------------------
NCC10-028        1.80   13.60      11.80    1.30    Chiis SW
------------------------------------------------------------------------
  including      5.40   10.60        5.2    1.75
------------------------------------------------------------------------
  and           15.40   17.00       2.60    1.15
------------------------------------------------------------------------
NCC10-029        3.80    4.80       1.00    0.87    Chiis Central
------------------------------------------------------------------------
  and            6.80    9.80       3.00    0.86
------------------------------------------------------------------------
  and           11.80   16.80       5.00    0.88
------------------------------------------------------------------------
  and           19.80   30.60      10.80    0.98
------------------------------------------------------------------------
NCC10-030        2.50    7.70       5.20    0.88    Chiis SW
------------------------------------------------------------------------
  and            9.80   15.10       5.30    0.80
------------------------------------------------------------------------
NCC10-031        4.30   16.50      12.20    1.12    Chiis Central
------------------------------------------------------------------------
NCC10-032        0.00    9.30       9.30    1.26    Chiis SW
------------------------------------------------------------------------
  including      3.30    4.30       1.00    1.63
------------------------------------------------------------------------
  and           11.30   22.50      11.20    1.25
------------------------------------------------------------------------
  including     18.30   21.30       3.00    1.52
------------------------------------------------------------------------
NCC10-033        2.80   15.40      12.60    0.99    Chiis Central
------------------------------------------------------------------------
NCC10-034        0.90   13.80      12.90    1.26    Chiis SW
------------------------------------------------------------------------
  including      6.50    9.40       2.90    1.78
------------------------------------------------------------------------
NCC10-035        1.20   15.00      13.80    1.09    Chiis Central
------------------------------------------------------------------------
NCC10-036        2.40   16.20      13.80    1.23    Chiis SW
------------------------------------------------------------------------
  including      9.50   10.50       1.00    1.55
------------------------------------------------------------------------
  and           13.80   14.90       1.10    1.68
------------------------------------------------------------------------
NCC10-037        3.90   13.50       9.60    1.06    Chiis Central
------------------------------------------------------------------------
NCC10-038        2.50   18.80      16.30    1.27    Chiis SW
------------------------------------------------------------------------
  including      9.70   15.80       6.10    1.58
------------------------------------------------------------------------
NCC10-039        9.00   16.10       7.10    1.12    Chiis Central
------------------------------------------------------------------------
These drill results do not differentiate limonite, transition or saprolite
zone mineralization. A 0.8% Ni cutoff was used to determine mineralized
sample intervals, with one internal sub-cutoff sample allowed per interval.

 

Six drill rigs are operating at the Mayaniquel project. The initial drill program at Nueva Caledonia, comprising 5,979 meters of drilling in 286 holes, has been completed and the two drill rigs have been moved to the Sechol deposit and Tres Juanes target area. The four remaining rigs continue to operate at Nueva Concepcion (1 rig) and Chiis (3 rigs). To date, 573 holes totaling 12,934 meters have been drilled on the Mayaniquel Project.

The Mayaniquel project comprises mineral exploration licenses totaling approximately 80,000 hectares in the nickel laterite belt surrounding Lake Izabal, 120 kilometers northeast of Guatemala City. Anfield's mineral exploration licenses lie adjacent to the "Fenix Project" owned by Compania Guatemalteca de Niquel S.A., a subsidiary of HudBay Minerals Inc.

On April 9, 2009, an independent NI 43-101 mineral resource estimate was prepared on the Mayaniquel project as shown in the table below:


-----------------------------------------------------------------------
-----
                  Cutoff Grade 0.8% Ni             Cutoff Grade 1.0% Ni
-------- ---------------------------------- --------------------------------
             Trans-      Sapro-               Trans-
Deposit     ition(1)    lite(2)     Total     ition    Saprolite    Total
-------- ----------- ----------- ---------- --------- ----------- ----------
         DMT(3)  Ni%   DMT   Ni%   DMT  Ni%  DMT  Ni%   DMT   Ni%   DMT  Ni%
----------------------------------------------------------------------------
Indicated Resources
----------------------------------------------------------------------------
Sechol    5.01  1.29 13.31  1.46 18.32 1.41 3.97 1.40 11.23  1.57 15.20 1.53
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Inferred Resources
----------------------------------------------------------------------------
Sechol    3.54  1.19 15.55  1.38 19.09 1.34 2.20 1.38 12.46  1.50 14.66 1.48
----------------------------------------------------------------------------
Chatala   2.17  0.97  3.89  0.99  6.06 0.98 0.54 1.24  1.36  1.18  1.90 1.20
----------------------------------------------------------------------------
Chiis(4)  1.26  1.19  2.04  1.35  3.30 1.29 1.15 1.22  1.52  1.50  2.67 1.38
----------------------------------------------------------------------------
El Tunico 0.01  0.92  2.89  1.15  2.90 1.15 0.00 0.00  1.66  1.34  1.66 1.34
----------------------------------------------------------------------------
Total     6.98  1.12 24.37  1.28 31.35 1.25 3.89 1.31 17.00  1.46 20.89 1.43
----------------------------------------------------------------------------
Mineral resources do not have demonstrated economic viability.
(1) The Transition zone is a mixed horizon of limonite and saprolite
    material and was defined using both geological logging data and chemical
    analysis.
(2) The Saprolite zone represents the lower part of the laterite profile
    below the Transition zone and was defined using both geological logging
    data and chemical analysis.
(3) DMT - dry million tonnes.
(4) Chiis is a zone within Nueva Concepcion.

 

In January 2010, Anfield initiated a 44,000 meter drill program at the project. The program is focused on expanding current NI 43-101 mineral resources at the Sechol and Nueva Concepcion (Chiis) deposits and delineating new resources at the Nueva Caledonia, Tres Juanes and San Lucas target areas.

Andrew Carstensen, CPG, Vice President, Exploration for Anfield, is the Qualified Person as defined by NI 43-101 for the Mayaniquel Project and has reviewed and approved the contents of this news release. The quality assurance/quality control program is monitored by independent consultant Dr. Bruce M. Davis, FAusIMM. Logging and sampling are completed at Anfield's secure facility located at the project. Drill core is mechanically split on site and samples securely transported to Inspectorate America Corp.'s Guatemala City sample preparation facility and subsequently to ALS Chemex's laboratory in Vancouver, Canada for X-Ray Fluorescence Spectroscopy (XRF) analysis, the common analytical technique used in nickel laterite exploration. Anfield inserts standards, blanks and duplicates selected on a random basis into the sample stream and sends 5% of the sample pulps to a check laboratory in Perth, Australia.

ANFIELD NICKEL CORP.

David Strang

CAUTION REGARDING FORWARD LOOKING STATEMENTS: This news release may contain "forward-looking statements" within the meaning of the applicable Canadian securities legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "can", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Anfield Nickel Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the exploration and potential development of the Company's projects, risks related to international operations, the actual results of current exploration activities, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, future prices of commodities, as well as those factors discussed in the sections relating to risk factors of our business filed in Anfield Nickel Corp.'s required securities filings on SEDAR. Although Anfield Nickel Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended.

There can be no assurance that any forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Anfield Nickel Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

To view maps of the Nueva Caledonia Target, the Nueva Concepcion Target, and the Chiis Target accompanying this press release, please click on the following link: http://media3.marketwire.com/docs/ANF706M3.pdf

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Contacts: Anfield Nickel Corp. David Strang + 604 646-1899 + 604 687-7041 (FAX)