Category: Base Metals

Thundermin and Cornerstone Intersect 3.8% Cu Over 9.1 Metres on the Little Deer Copper Deposit, Springdale Area, Newfoundland

Thundermin Resources Inc. ("Thundermin")(TSX:THR) and 50% joint venture partner Cornerstone Resources Inc. ("Cornerstone")(TSX VENTURE:CGP) announce that they have intersected 3.8% Cu over a core length of 9.1 m in hole LD-09-22 on the Little Deer Copper Deposit (the "Deposit"). In addition, wedge hole LD-08-16A intersected variable amounts of copper mineralization over a core length of 99 m within strongly altered mafic volcanics in the western portion of the Deposit. The best intervals within this zone include 1.9% Cu over a core length of 15.8 m, including 2.9% Cu over 5.7 m, 1.5% Cu over 23.3 m, including 3.1% Cu over 6.2 m and 1.2% Cu over 9.4 m (Table 1 and Figure 1). To date, the copper mineralization in the Little Deer Deposit has been intersected over a strike length of approximately 1,050 m and to a vertical depth of approximately 895 m. The Deposit remains open to the east, west and at depth.

Table 1: Little Deer Drill Results (2009)

----------------------------------------------------------------------------
Hole No.     East  North       Dip        Az    From    To   Interval    Cu
               (m)    (m) (degrees) (degrees)     (m)   (m)     (m)(i)   (%)
----------------------------------------------------------------------------
LD-09-22   13,001  4,668     -70.6     334.9   697.1 706.2        9.1   3.8
----------------------------------------------------------------------------
incl.                                          698.7 700.3        1.6  13.9
----------------------------------------------------------------------------

----------------------------------------------------------------------------
LD-08-16A  12,979  4,650     -72.9     319.5   881.9 891.3        9.4   1.2
----------------------------------------------------------------------------
and                                            922.9 946.2       23.3   1.5
----------------------------------------------------------------------------
incl.                                          940.0 946.2        6.2   3.1
----------------------------------------------------------------------------
and                                            961.3 977.1       15.8   1.9
----------------------------------------------------------------------------
incl.                                          971.4 977.1        5.7   2.9
----------------------------------------------------------------------------

----------------------------------------------------------------------------
LD-09-23   13,141  4,640     -70.7     315.2   Hole currently drilling
----------------------------------------------------------------------------
(i) Reported intervals are core lengths - true widths are yet to be
    determined.


The current diamond drilling program is part of a $900,000 exploration program consisting of approximately 5,800 m of drilling that was announced on February 25, 2009 for the Little Deer copper property for the first half of 2009. Approximately 4,160 m of drilling in six holes has been completed to date. The current drill program is on-going and is expected to be finished near the end of June. As announced on May 12, 2009, Micon International Limited ("Micon") is preparing an initial National Instrument 43-101 compliant mineral resource estimate for the Deposit based on all drill hole data up to and including wedge hole LD-08-16A. It is anticipated that Micon will complete this resource estimate early in the third quarter of 2009.

The copper-rich sulphide intersection in hole LD-09-22, which occurs in the western portion of the Deposit at a vertical depth of approximately 625 m, consists of disseminated, stringer, semi-massive and massive sulphides containing variable amounts of chalcopyrite, pyrrhotite and pyrite within strongly altered mafic volcanic rocks. This intersection occurs approximately 110 m east and 90 m above the intersection in hole LD-08-10A that graded 2.2% Cu over 16.8 m, including 3.9% Cu over 5.9 m (Table 1 and Figure 1).

Hole LD-08-16A intersected variable amounts of chalcopyrite, pyrrhotite and pyrite within a 99 m wide zone of strongly altered mafic volcanic rocks (Table 1 and Figure 1). The intensity and magnitude of chlorite alteration and the amount of copper mineralization appears to increase at depth in this area of the Deposit. The bottom portion of the intersection in hole LD-08-16A occurs at a vertical depth of approximately 895 m and is the deepest intersection to date within the Deposit.

Hole LD-09-23, which is currently drilling, is collared to intersect the copper-bearing zone approximately 175 m east of the intercept in LD-08-10A at a vertical depth of approximately 725 m (Table 1 and Figure 1).

Thundermin, the operator, and Cornerstone have the option, on a 50/50 basis to earn a 100% interest in the Little Deer copper deposit and adjacent property from Weyburn Investments Ltd. Thundermin, under its joint venture agreement with Cornerstone, has the right to increase its interest in the Little Deer property to 75% by completing a feasibility study and by arranging 100% of the necessary bank financing required to place the property into commercial production. Details on the Little Deer copper deposit and the terms of the agreement with Weyburn can be found in news releases dated May 1, June 21, July 9, October 30, December 11, 2007 and January 24, April 9, May 15, June 6, June 17, July 25, November 26, 2008 and February 25 and May 12, 2009 and on Thundermin's and Cornerstone's respective websites and on SEDAR.

Mr. Andrew Hussey, P.Geo., Project Geologist and Lands Manager, Cornerstone Resources Inc., is the qualified person that is responsible for supervising the drilling program on the property for the purposes of National Instrument 43-101. Mr. Hussey is also the qualified person that has reviewed and approved the contents of this release. All holes drilled by Thundermin and Cornerstone are NQ in size. Specific gravity measurements, rock quality determinations and photographic logging of significant mineralized intersections are performed systematically prior to assaying. The core is logged and the mineralized sections, where appropriate, are sawn in half at a core logging facility in Springdale. Half of the core is submitted for analyses to Eastern Analytical Limited an independent and qualified assayer located in Springdale and the remaining half of the core is kept for future reference. Blanks, duplicates and standards are routinely used as part of the assay procedures.

Thundermin and Cornerstone would like to acknowledge the financial support received from the Junior Exploration Assistance (JEA) Program of the Province of Newfoundland and Labrador in carrying out a portion of their work on the Little Deer property.

Forward-Looking Statements

This news release may contain "Forward-Looking Statements" that involve risks and uncertainties, such as statements of Thundermin's plans, objectives, strategies, intentions and expectations. The words "potential," "anticipate," "forecast," "believe," "estimate," "expect," "may," "project," "plan," and similar expressions are intended to be among the statements that identify "Forward-Looking Statements". Although Thundermin believes that its expectations reflected in these "Forward-Looking Statements" are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed in our regulatory filings that can be viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behaviour of financial and metals markets and from numerous other matters of national, regional, and global scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory nature. These uncertainties may cause our actual future results to be materially different than those expressed in our "Forward-Looking Statements". Although Thundermin believes the facts and information contained in this news release to be as correct and current as possible, Thundermin does not warrant or make any representation as to the accuracy, validity or completeness of any facts or information contained herein and these statements should not be relied upon as representing its views subsequent to the date of this news release.

For further information on Thundermin Resources Inc. please visit Thundermin's website at www.thundermin.com or the SEDAR website at www.sedar.com.

To view a map of the LDJV - Little Deer Project, please visit the following link: http://media3.marketwire.com/docs/thr616_4.pdf

SOURCE: Thundermin Resources Inc.

Thundermin Resources Inc. John B. Heslop President & CEO (647) 344-1167 Thundermin Resources Inc. James W. Gill Chairman (416) 450-1851 This email address is being protected from spambots. You need JavaScript enabled to view it. www.thundermin.com