Category: Base Metals

Inspiration Intersects 1.553% Ni Over 16.93m or 55.55ft Including 5.891% Ni Over 3.81m or 12.49ft (True Width)

Inspiration Mining Corporation (the "Corporation") (TSX: ISM)(FRANKFURT: OI8) is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No.2 Mine.

Inspiration is continuing the drilling at the Langmuir Project - Langmuir No.1 Mine. The detail fill-in drill program is designed to complete the definition of the nickel bearing mineralization below the 300-foot mine level to a vertical depth of approximately 900 feet below surface.

The following table indicates the drill information for the Langmuir No.1 Mine drill holes:


-----------------------------------------------------------------------
----
------------------------------------------------------------------
---------
               Grid     Grid                      Section   Section
           Northing  Easting           Azimuth   Northing   Easting  Length
Drill Hole  (metres) (metres)    Dip (Geodetic)     (feet)    (feet)     (m)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-117    1298.38  2600.37  -68.24    306.37    3591.13  11446.71  900.22
---------------------------------------------------------------------------
L108-118    1264.71  2253.67  -49.90    302.97    3300.46  10341.47  179.42
---------------------------------------------------------------------------
L108-119    1330.90  2407.03  -51.66    305.87    3595.20  10803.49  272.94
---------------------------------------------------------------------------
L108-120    1330.76  2407.28  -62.69    305.55    3594.88  10804.38  310.75
---------------------------------------------------------------------------
L108-121    1300.81  2600.52  -56.00    295.38    3599.10  11445.95  728.66
---------------------------------------------------------------------------
---------------------------------------------------------------------------

Drill holes L108-117 and L108-121 were located approximately 174 metres or 571 feet east of previously reported drill hole L107-65 to evaluate the down dip and down plunge nickel mineralization. Two low grade zone were intersected and may represent the halo beside higher grade nickel mineralization at a vertical depth of 1260 feet and 1625 feet in hole L108-121 and 1525 feet and 2650 feet in hole L108-117.

Drill hole L108-118 was located at previously reported drill holes L107-81 and L107-82 and to fill-in a gap beneath the 315 foot level for the resource estimations.

Drill holes L108-119 and L108-120 were located approximately 50 metres or 163 feet east of previously report drill holes L107-79 and L107-80. These holes were designed to outline the extent of the mineralization above and below hole L107-80. Several narrow nickel bearing zones were intersected in both drill holes. The lower intersection in hole L108-120 was terminated by a felsic intrusive dyke.

The following assay results for drill holes L108-117 to L108-121 at the former Langmuir No.1 Mine have been received, compiled and condensed to the following:


-----------------------------------------------------------------------
----
                                      Core   True    Core   True  Weighted
                      From      To  Length  Width  Length  Width   Average
Drill Hole              (m)     (m)     (m)    (m)    (ft)   (ft)     Ni(%)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-117            500.00  505.00    5.00   3.21   16.40  10.54     0.255
        -------------------------------------------------------------------
               and
         -------------------------------------------------------------------
                    874.35  900.22   25.87  17.97   84.88  58.96     0.255
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-118             90.00   99.40    9.40   7.51   30.84  24.63     0.436
         -------------------------------------------------------------------
                     93.00   94.90    1.90   1.52    6.23   4.98     0.714
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    102.80  108.80    6.00   4.79   19.69  15.72     0.541
        -------------------------------------------------------------------
                    102.80  103.80    1.00   0.80    3.28   2.62     1.850
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    114.80  136.00   21.20  16.93   69.55  55.55     1.553
        -------------------------------------------------------------------
        containing  123.00  136.00   13.00  10.24   42.65  33.61     2.355
        -------------------------------------------------------------------
                or  130.15  134.98    4.83   3.81   15.85  12.49     5.891
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    154.80  155.50    0.70   0.56    2.30   1.83     1.075
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    173.60  174.10    0.50   0.40    1.64   1.31     1.185
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-119            233.00  235.00    2.00   1.60    6.56   5.24     0.464
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    241.00  243.00    2.00   1.60    6.56   5.24     0.593
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    263.00  264.80    1.80   1.44    5.91   4.72     0.767
        -------------------------------------------------------------------
        containing  263.00  263.86    0.86   0.69    2.82   2.25     1.110
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-120            224.04  227.00    2.96   1.98    9.71   6.50     0.412
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    274.80  276.37    1.57   1.05    5.15   3.45     0.424
---------------------------------------------------------------------------
---------------------------------------------------------------------------
L108-121            469.00  471.40    2.40   1.92    7.87   6.29     0.625
        -------------------------------------------------------------------
               and
        -------------------------------------------------------------------
                    608.00  612.00    4.00   3.15   13.12  10.34     0.548
---------------------------------------------------------------------------

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine-grained disseminatations up to massive 100% sulphides, is contained within serpentenized komatiitic ultramaftic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of split core samples was conducted by Swastika Laboratories, and included the insertion of blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the technical data in this release is Kian Jensen, B.Sc., P.Geo.(Ont), who is an arm's length party retained by the Company to carry out its exploration program on the Langmuir Project.

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Contacts: Inspiration Mining Corporation Randy Miller President (905) 853-7400 Website: www.inspirationmining.com For Investor Relations call: Gale Capital Corporation (604) 221-7604 (604) 221-7606 (FAX) Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

SOURCE: Inspiration Mining Corporation

http://www.inspirationmining.com mailto:This email address is being protected from spambots. You need JavaScript enabled to view it.