Alexandria Extends Zone of High Grade Gold Veins at Orenada With 3.4 Meters Grading 17.03 g/t Gold

TORONTO, ONTARIO--( Apr 30, 2015) - Alexandria Minerals Corporation (TSX VENTURE:AZX)(A9D.F)(OTC PINK:ALXDF) ("Alexandria" or the "Company") is pleased to announce new high grade assay results in diamond drill hole OAX-15-54 at its Orenada project in Val d'Or, updating previously released results (Press Release April 22, 2015). The updated data expand the earlier reported drilled intersection to 3.14 g/t gold over 27.8 meters, including 17.03 g/t over 3.4m and 131 g/t gold over 0.4m.

These results lengthen the mineralized drill intersection from 111.3 meters grading 1.24 g/t gold to 158.5 meters grading 1.43 g/t gold, and deepen the zone from 282.8 meters downhole to 330.0 meters downhole.

Read more: Alexandria Minerals Corporation ( AZX )

Kootenay announces Phase II drilling on La Negra discovery extends silver mineralization a further 150 meters in depth

VANCOUVER, April 30, 2015 - Kootenay Silver Inc. (TSX VENTURE: KTN.V) ("Kootenay") is pleased to announce results from an additional seven holes of its Phase II drill program on its Promontorio La Negra Diatreme Silver discovery in Sonora, Mexico. The seven holes were designed to extend the known areas of mineralization along strike, down dip and to fill in large gaps. Results continue to affirm La Negra's potential for the delineation of a high-medium grade, open-pittable silver resource and for adding substantial additional silver resources at depth.

Read more: Kootenay Silver Inc ( KTN )

GoldQuest Releases Highlights of Revised PEA for Romero Gold-Copper Project

Net Present Value (6% Discount Rate) of US$219 Million After-Tax

VANCOUVER, BC--(April 29, 2015) - GoldQuest Mining Corp. (TSX VENTURE: GQC) (M1W.F) (M1W.F) ("GoldQuest" or the "Company") has revised the Preliminary Economic Assessment ("Revised PEA") for a proposed underground mine at its 100% owned Romero and Romero South gold-copper deposits in the Dominican Republic. The Revised PEA was led by JDS Energy & Mining Inc. ("JDS"). All costs are in US dollars unless otherwise stated, with a USD/CDN exchange rate of 0.80 and metal price assumptions are $1,225/oz gold, $2.90/lb copper and $17/oz silver.

Read more: GoldQuest Mining Corp (GQC )

Calibre Drilling Expands High Grade Blag Gold-Silver System, Eastern Borosi Project, Nicaragua Including 9.92 Metres Grading 5.36 g/t Gold and 194.6 g/t Silver

VANCOUVER, BRITISH COLUMBIA--(April 27, 2015) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce the second set of results from the 2015 drilling program on the Eastern Borosi gold-silver project (the "Project") which is being financed under an option agreement with IAMGOLD Corporation ("IAMGOLD").

Highlights

  • Diamond drilling on the Blag gold-silver vein system continues to intersect high grade gold and silver mineralization including: 9.92 metres grading 5.36 g/t Gold and 194.6 g/t Silver, 5.85 metres grading 5.97 g/t Gold and 56.1 g/t Silver, 4.04 metres grading 1.79 g/t Gold and 77.2 g/t Silver, and 1.91 metres grading 5.36 g/t Gold and 127.8 g/t Silver.
    Read more: Calibre Mining Corp ( CXB )

Scorpio Gold Sets Quarterly Production Record at the Mineral Ridge Operation, Nevada

VANCOUVER, BRITISH COLUMBIA--(Apr 23, 2015) - Scorpio Gold Corporation ("Scorpio Gold" or the "Company") (TSX VENTURE:SGN) announces its operating results for the first quarter ("Q1") of 2015 at its 70% owned Mineral Ridge project, located in Nevada.

Gold production in Q1 2015 totalled 11,952 ounces, representing a 16% increase over Q1 2014 and a new quarterly production record for the Mineral Ridge operation. Silver production totalled 6,319 ounces, representing a 23% increase over Q1 2014 and also a record high for Mineral Ridge.

Peter J. Hawley, CEO, reports, "We are very pleased to report a new quarterly production record at Mineral Ridge. While we are currently cycling through lower grade material in the Mary pit, our gold production continues to be aided by the drawdown of ounces from the leach pad inventory and by ongoing efforts to re-slope the periphery of the leach pad to bring previously un-leached material under leach. This is a strong start to the year and puts Scorpio Gold in a very good position to meet our 2015 production forecast of 40,000 to 45,000 ounces of gold."

Read more: Scorpio Gold Corporation ( SGN )