The Blockades Have Ended — Full Access to All Company Facilities Restored

TORONTO, April 06, 2018  -- Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX:TXG) reports that negotiations between community leaders have resulted in an end to the illegal blockades of the Company’s ELG Mine Complex, supporting infrastructure, and the Media Luna Project, all of which are in southwest Mexico. Processing operations have continued uninterrupted since the restart in mid January. Mining in the El Limon Pit is expected to resume today.
 
Fred Stanford, President & CEO of Torex stated: “We are more than pleased that we can now get back to unimpeded operations and value creation for the Company’s shareholders and all stakeholders. During the first quarter, the quality of the team, and the asset, were clearly evident as they pulled together under very challenging operating conditions and produced 67,000 ounces of gold in Dore. They also shipped 8000 gold ounces in carbon fines.
Read more: Torex Gold Resources ( TXG )

Chakana Copper Intersects 44.1 Metres with 2.02% Copper and 8.50 g/t Gold (7.81% Cu_eq) Including 19.4 Metres with 2.70% Copper and 14.36 g/t Gold (12.31% Cu_eq) in Breccia Pipe 1

VANCOUVER, April 4, 2018 - Chakana Copper Corp. (TSX-V: PERU; OTC: CHKKF; FWB: 1ZX) (the "Company" or "Chakana"), is pleased to announce assays from four additional step-out holes in Breccia Pipe 1 (Bx 1) at its Soledad copper-gold-silver project in central Peru, optioned from Condor Resources Inc. The Soledad project (the "Project") is located 35 km south of the Pierina mine in the prolific Miocene metallogenic belt of Peru. These results are a successful continuation of the drilling program that was initiated August 16, 2017, with the results of the first thirty-two drill holes released previously (see: www.chakanacopper.com).  This Phase 1 drilling program is ongoing with a total of 12,328m drilled to date out of an original planned program of 16,660m and is ahead of schedule and under budget.
Read more: Chakana Copper Corp ( PERU )

Atlantic Gold Reports Final Assay Results from the Phase 3 Resource Expansion Drill Program at Cochrane Hill

INFILLING, AND IDENTIFYING EXTENSIONS TO KNOWN MINERALIZATION AT COCHRANE HILL
 
NEW HIGH-GRADE ZONE DISCOVERED TO THE NORTH EAST BELOW PREVIOUS DRILLING – OPEN AT DEPTH AND TO THE EAST
HIGHLIGHTS INCLUDE:
 
COCHRANE HILL:
13m @ 1.48g/t Au from 184m, then 21m @ 2.24g/t from 201m
29m @ 1.19g/t Au from 177m, then 9m @ 2.94g/t Au from 238m
7m @ 11.48g/t Au from 131m (incl 1m @ 76.7g/t from 131)
 
VANCOUVER, April 4, 2018 - Atlantic Gold Corporation (TSX-V: AGB) ("Atlantic" or the "Company") is pleased to report final assay results received from the Phase 3 Resource Expansion drilling program at the Cochrane Hill gold deposit.
Read more: Atlantic Gold Corporation ( AGB )

Bonterra Extends Gladiator Gold Deposit Further Westward 17.8 g/t Au Intersected over 3.0 Meters

VANCOUVER, April 3, 2018  - Bonterra Resources Inc. (TSX-V: BTR, OTCQX: BONXF, FSE: 9BR1) (the "Company" or "Bonterra") is pleased to announce the latest results from the ongoing winter drilling campaign at the Gladiator Gold Deposit, including an intersection of 17.8 g/t Au over 3.0 m. High-grade intersections extend multiple zones westward, adding strike length at the Rivage Gap and continue to demonstrate the continuity of the deposit, highlighting the predictability of the mineralized zones. The ongoing drilling campaign, totaling 70,000 m in 2018, includes infill and definition drilling at the Gladiator Gold Deposit. Multiple drill holes are in the lab with assays pending.
Read more: Bonterra Resources Inc ( BTR )

Dynacor Produces 6,636 Oz of Gold in February

MONTREAL, QUEBEC--(March 19, 2018) - Dynacor Gold Mines Inc. (TSX:DNG)(OTC:DNGDF) (Dynacor or the Corporation) is pleased to report its February 2018 gold production.
 
In February, the Corporation produced 6,636 ounces of gold at its Veta Dorada plant located in Chala, Peru surpassing the previous month of production by 19.4% (5,560 ounces in January 2018), see Figure 1, below. This monthly production is similar to the February 2017 production of 6,733 ounces which was attributable to the abnormally high-grade ore processed.
 
In February 2018, the Veta Dorada plant processed 6,278 DMT of material compared to 5,630 DMT in 2017, an 11.5% increase. Furthermore, in February the daily processing rate was 3.8% higher than in January.
 
Total ore processed in January and February 2018 (13,010 DMT) compared to 2017 (10,933 DMT) and to 2016 (8,273 DMT) shows an important upward trend, representing year on year increases of 19% and 32% respectively.
Read more: Dynacor Gold Mines ( DNG )