McEwen Mining 2013 Production Up 33% Over 2012; 139,455 Gold Eq. oz Produced in 2013

McEwen Mining Inc. (MUX)(MUX.TO) is pleased to announce full-year and Q4 production results. For the full-year, the Company's total production was 139,455 gold eq. oz comprised of 79,158 gold oz and 3,135,467 silver oz. This represents an approximate 33% increase compared to 2012.

In Q4 the Company produced 37,167 gold eq. oz (20,686 gold oz and 857,011 silver oz). This is 15% higher than Q4 2012.

Read more: McEwen Mining Inc ( MUX )

Goldcorp announces offer to acquire Osisko for C$5.95 per share in cash and shares

GOLDCORP INC. (TSX: G, NYSE: GG) today announced that it intends to commence an offer to acquire all of the outstanding common shares of Osisko Mining Corporation ("Osisko") (TSX: OSK, Deutsche Boerse: EWX) for approximately C$2.6 billion in cash and shares (the "Offer").

Under the terms of the Offer, Osisko shareholders will be entitled to receive 0.146 of a Goldcorp common share plus C$2.26 in cash for each Osisko common share. Based on Goldcorp's TSX closing share price of C$25.29 on January 10, 2014, the total consideration offered to Osisko shareholders is C$5.95 per Osisko common share representing a premium of 28% over the 20-day volume-weighted average share price of Osisko from all trading on Canadian exchanges for the period ending January 10, 2014 and a premium of 15% over Osisko's TSX closing share price on January 10, 2014.

Read more: Osisko Mining Corporation ( OSK )

Cayden drills 35.5 meters of 1.62 g/t gold and 18 meters of 3.38 g/t gold in two separate mineralized structures at El Barqueño

Cayden Resources Inc. (TSX.V:CYD.V ) ("Cayden" or the "Company") is pleased to announce results from the Company's ongoing core drilling program at the El Barqueño Gold Property in Jalisco State, Mexico.Drilling highlights include 35.5 meters of 1.62 g/t Au, 214 g/t Ag, and 0.66 % Cu in hole 15, 18 meters of 3.38 g/t Au in hole 21 and 10 meters of 4.4 g/t Au in hole 24. Hole 25, the furthest hole drilled in the northeast part of the Zapoteca structure, hit three different intercepts of stock work mineralization including 27 meters of 1.16 g/t Au starting at surface.

The first 25 holes at the Azteca target area have tested approximately 1.2 km of the 2.2 km interpreted strike length to date.  All the holes drilled in the Azteca target with the exception of one hole have penetrated the mineralized structures and have intersected significant gold mineralization.

Read more: Cayden Resources Inc ( CYD )

Corvus Gold Drills 33 metres @ 4.14 g/t Gold at Yellowjacket High-Grade Deposit, North Bullfrog Project, Nevada

Intersects New High-Grade Gold System at Air Track Hill 1,000 metres SW of Yellowjacket

Corvus Gold Inc. ("Corvus" or the "Company") - (TSX: KOR, OTCQX: CORVF) announces initial assay results from three core holes along the northern extension of the Yellowjacket deposit, and two core holes from the western extension of the Sierra Blanca deposit, at the North Bullfrog Project, Nevada. Drill hole NB-13-368 at the Yellowjacket deposit returned 33.3 metres @ 4.14 g/t gold and is 140 metres along strike from the previously reported intersection (NB-13-360, 9.6 metres @ 6.34 g/t gold - NR13-32, December 5, 2013).

Read more: Corvus Gold Inc ( KOR )

Centerra Enters Into Non-Binding Heads of Agreement with the Kyrgyz Government

This news release contains forward-looking information that is subject to the risk factors and assumptions set out on under the heading, "Cautionary Note Regarding Forward-looking Information". All dollar figures are in U.S. dollars.

Centerra Gold Inc. (CG.TO) today announces that it has entered into a non-binding Heads of Agreement (the "HOA") with the Government of the Kyrgyz Republic and Kyrgyzaltyn JSC ("Kyrgyzaltyn") in connection with a potential restructuring transaction under which Kyrgyzaltyn would exchange its 32.7% equity interest in Centerra for a 50% interest in a joint venture company that would own the Kumtor Project.

Read more: Centerra Gold Inc ( CG )