Donnycreek Announces Kakwa Montney Test Results of 2,532 boe Per Day (823 boe Per Day Net)
Donnycreek Energy Inc. ("Donnycreek" or the "Company") reports that the first horizontal Montney well Hz 13-17-63-5 W6M ("13-17 Well"), located on its 16 section (8 net) 50% working interest contiguous land block at Kakwa, Alberta has been successfully drilled and completed with a 15 stage foam frac.
Following a 96 hour frac flow back, the 13-17 Well was still cleaning up, with average gross production rates over the final 24 hours of production testing being 1,150 bbls/d condensate and 8.29 MMscf/d gas (374 bbls/d and 2.69 MMscf/d; 823 boe/d net to Donnycreek, before payout including royalty share of production) against a wellhead pressure of 1,100 psi (7,584 kPa). In addition to well head condensate, gas analysis from the 13-17 Well suggests that an additional 25-35 bbls/MMscf of natural gas liquids are recoverable through typical refrigeration processing, and up to 70 bbls/MMscf if deep cut processing is available.
- Published: 04 May 2012
- Written by Editor