Lithium One Reports ADDITIONAL DRILL RESULTS for its James Bay Lithium Project
Lithium One Inc (the "Company") (TSX-V: LI), is pleased to announce the second set of results from its Phase 2 diamond drill program at the James Bay Lithium Project in Quebec. Highlights of the results from these 20 holes include: 26.97m of 1.76% Li2O, 21.0m of 1.98% Li2O, and 23.46m of 1.65% Li2O. Compared with intercepts reported in the previous news release of August 10th 2009, the intercepts from these holes are wider, with a similar average grade of 1.60% Li2O. Pegmatite intercepts greater than ten metres are summarized in Table 1 below.
Table 1. Phase 2 Drilling Results, August 11th to September 1st, 2009
- Published: 02 September 2009
- Written by Editor