Nevada Zinc Intersects Extensive High Grade Zinc-Lead Mineralization 91.44m (300 Ft) Grading 9.49% Zinc and 1.34% Lead (10.83% Zinc+Lead)

TORONTO, ON July 22, 2015 / Nevada Zinc Corporation (NZN.V) ("Nevada Zinc" or the "Company") announces that additional Phase 3 drill hole results show the continuation of the zinc mineralization at the Discovery Zone both down-dip and along strike. Highlight drill hole LM-15-36 intersected very significant high grade zinc and lead mineralization averaging 9.49% zinc and 1.34% lead over a 91.44 metre (300 foot) interval. Drill hole LM-15-36 hole was drilled to intersect the deeper extension of the broad zone of mineralization recently reported in drill hole LM-15-27 (press release June 1, 2015) and is now the deepest hole drilled on the Discovery Zone which still remains open to expansion down dip from this location as well as in both directions along strike.

President and CEO, Bruce Durham commented on the results: "We continue to intersect long intervals of high grade zinc lead mineralization and also expand the overall footprint of the Discovery Zone. Importantly there is no drilling beyond the long high grade interval intersected in drill hole LM-15-36 so the ultimate dimensions of the Discovery Zone remain open to further significant expansion."

Read more: Nevada Zinc Corporation ( NZN )

Nevada Copper Intersects 448 Feet Grading 1.0% Copper

VANCOUVER, BRITISH COLUMBIA--(Jul 15, 2015) - Nevada Copper Corp. (NCU.TO) ("Nevada Copper" or the "Company") is pleased to announce drill results at the Company's 100%-owned Pumpkin Hollow project located near Yerington Nevada.

The primary objective of the drilling was to obtain additional samples for iron metallurgical testwork. The assay results however also contained several notable high grade copper intersections in the South open pit, including 230 feet (188 feet true thickness) grading 1.49% copper within a broader zone of 448 feet (367 feet true thickness) grading 1.0% copper. The copper- and iron-dominated intersections are shown in separate tables below.

Drilling in the South open pit area for the iron metallurgical test bulk sample has been completed. In April 2015, the Company announced a Memorandum of Understanding ("MOU") with a large multi-national steel producer to assess opportunities to exploit Pumpkin Hollow's iron resource. The assessments would include drill sampling consisting of six holes for a total of 8,500 feet (2,600 meters). Drill results have now been received with results reported for both iron and copper dominated zones.

Read more: Nevada Copper Corp ( NCU )

Atico Produces 2.9 Million Pounds of Cu and 2,298 Ounces of Au in Second Quarter 2015

VANCOUVER, BRITISH COLUMBIA--(Jul 14, 2015) - Atico Mining Corporation (the "Company" or "Atico") (TSX VENTURE:ATY)(OTC PINK:ATCMF) announces its operating results for the three months ended June 30, 2015 from its El Roble mine. Production for the quarter totaled 2.9 million pounds of copper and 2,298 ounces of gold in concentrates, an increase of 41% and 7% respectively for copper and gold over the same period in 2014.

"In the second quarter 2015 we delivered a significant improvement over the same period last year and results just slightly below our expectations despite facing extreme weather conditions and flooding in the region," said Fernando E. Ganoza, CEO. "In the latter half of June we experienced improved weather conditions and a strong conclusion to the quarter. We remain optimistic that we will be able to operate the mill at current capacity of 650 tonnes per day throughout the remainder of the year."

Read more: Atico Mining Corporation ( ATY )

Taseko Announces Strong Second Quarter Production Results

VANCOUVER, July 8, 2015 - Taseko (TSX: TKO; NYSE MKT: TGB) (the "Company") announces second quarter 2015 production of 39.8 million pounds of copper and 479 thousand pounds of molybdenum from the Gibraltar Mine, increases of 40% and 18%, respectively, over the first quarter of 2015.

Total sales for the second quarter were 42 million pounds of copper and 400 thousand pounds of molybdenum.

Russell Hallbauer, President and CEO of Taseko, commented, "Gibraltar operated to expectation during the second quarter. Increased production was a result of improved copper grade, better than design mill throughput and higher copper recoveries. Additionally, mine site spending remained at a similar level to the first quarter, which will result in lower site operating costs per pound in the second quarter."

Read more: Taseko Mines Limited ( TKO )

Osisko's Coulon Project Drilling Intercepts 14.2m Averaging 4.25% Cu, 6.69% Zn, 73.32 g/T Ag and 0.7 g/T Au

New Drilling Returns Highest Grade Intercepts to Date from Lens 257

MONTREAL, QUEBEC--(Marketwired - Jun 25, 2015) - Osisko Gold Royalties Ltd. (the "Company" or "Osisko") (OR.TO) is pleased to provide an update on recent 2015 drilling results from the Coulon project, located in James Bay, Quebec.

The early 2015 exploration program consisted of 32 holes for a total of 18,036 metres and of surface and borehole surveying. Oriented drilling (16 holes for a total of 7,438 metres) tested the extensions of Lens 257 and tightening the drill grid within the lens. Furthermore, 16 holes for a total of 10,436 metres were drilled over regional targets while a hole was drilled to a depth of 162 metres on Lens 43. In terms of geophysics, a surface InfiniTEM survey was completed while the borehole survey was completed in 7 drill holes.

Read more: Osisko Gold Royalties Ltd ( OR )